INSP-Final Inspection | 2/10/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area work complete.
|
INSP-Sprinkler Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above suspended ceiling complete, a couple of areas has plywood supporting grid, plywood nees to be treated wood or replaced with non-combustible material, if wood is not treated and remains then upright heads will be required.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Application received | | | 10/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 30 2019 8:56AM
|
Intake Approval | | | 10/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/30/2019 | | 10/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/30/2019 | | 10/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 10/30/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/30/2019 | | DONE |
|
|
|
|