INSP-Final Inspection | 3/23/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by John Lopez
|
INSP-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | CANC |
Troy Cobbley
|
|
|
Canceled per John.. Phone #: ###-#### Inspection requested via web by John Lopez
|
INSP-Alarm Testing | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | DONE |
Troy Cobbley
|
|
|
To final project I need the plan mods, verify changes in the field, shunt in elevator repaired, map and final doc's
Troy Phone #: ###-####
|
Permit Ready to Issue | | | 3/19/2020 | | DONE |
|
|
|
**plan mod - do not reissue**
|
CHANGE STATUS TO (ISS) | | | 3/19/2020 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/17/2020 | 3/18/2020 | 3/18/2020 | P | FAIL |
Troy Cobbley
|
|
|
Testing today consisted of a walk through for business. See city approved plans for minor modifications needed for notification devices. Plan resubmittals are needed to show the changes. We also tested the smoke detectors and notification on the 4th floor. Need to test 3rd, 2nd, 1st floors and elevator.
Phone #: ###-#### Inspection requested via web by John Lopez
|
Plan resubmittals received | | | 3/18/2020 | | DONE |
|
|
|
John requested the work flow to be opened for an as built #2
|
Plan assigned to (Lee) | 3/18/2020 | | 3/18/2020 | | DONE |
Lee G Meredith
|
|
|
as built 2
|
1st review completed | | | 3/18/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/18/2020 | | 3/18/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/18/2020 | | DONE |
|
|
|
Minimum $65 review fee for plan mod.
|
INSP-Alarm Testing | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | DONE |
Troy Cobbley
|
|
|
Lee verified the head end equipment and the interconnection with the fire sprinkler devices. He noted that there may be sync issues. Candellas and smoke detectors need tested as well as elevator recall.
John Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/13/2020 | | DONE |
|
|
|
plan mod
|
INSP-Alarm Testing | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | NR |
Troy Cobbley
|
|
|
Plan mods are needed showing the correct fire alarm panel model installed and the correct means of communication installed. These items currently do not match the approved plans. No testing performed.
Phone #: ###-#### Inspection requested via web by John Lopez
|
Plan resubmittals received | | | 3/11/2020 | | DONE |
|
|
|
as built requested by John Lopez from TKG Protection
|
Plan assigned to (Lee) | 3/11/2020 | | 3/11/2020 | | DONE |
Lee G Meredith
|
|
|
as built- part changes and path of comunication changes
|
1st review completed | | | 3/11/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/11/2020 | | 3/11/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/11/2020 | | DONE |
|
|
|
As Built - No fee
|
Permit Ready to Issue | | | 3/11/2020 | | DONE |
|
|
|
plan mod
|
Issue and Print Permit | | | 2/12/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 2/4/2020 | | 2/6/2020 | | DONE |
Lee G Meredith
|
|
|
plan mod
|
1st review completed | | | 2/6/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 2/6/2020 | | 2/6/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/6/2020 | | DONE |
|
|
|
Plan mod passed. No additional review comments provided. Minimum review fee of $65 is due.
|
Permit Ready to Issue | | | 2/6/2020 | | DONE |
|
|
|
plan mod approved
|
Plan Modification Accepted | | | 2/4/2020 | | DONE |
|
|
|
John requested the Eplan workflow to be reopend over the phone for changes in the system
|
Plan resubmittals received | | | 12/11/2019 | | DONE |
|
|
|
|
1st review completed | | | 12/11/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/11/2019 | | 12/11/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/11/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 12/11/2019 | | DONE |
|
|
|
MET
|
Issue and Print Permit | | | 12/11/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 11/14/2019 | | 11/14/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 11/14/2019 | | FAIL |
|
|
|
Smoke fire damper detection missing, needs engineer of record review, detectors may be too close to fixed cooktops. Returned to John Lopez and sent him an email listing issues.
|
Application received | | | 11/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2019 5:38PM
|