INSP-Final Inspection | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed per scope of work. GR
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | FAIL |
Troy Cobbley
|
|
|
Need the new plan mods/city stamped plans. Need the manual pull station mounted between the correct heights. I did verify phone line troubles and that there are two separate phone lines. Panel model and batteries are ok.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
CHANGE STATUS TO (ISS) | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
Plan assigned to (Lee) | 2/5/2020 | | 2/6/2020 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/6/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 2/6/2020 | | 2/6/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/6/2020 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 2/6/2020 | | DONE |
|
|
|
as built approved
|
Plan resubmittals received | | | 2/5/2020 | | DONE |
|
|
|
as built
|
Issue and Print Permit | | | 12/11/2019 | | DONE |
|
|
|
|
Application received | | | 12/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2019 1:54PM
|
Plan assigned to (Lee) | 12/10/2019 | | 12/10/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 12/10/2019 | | PASS |
|
|
|
|
1st review completed | | | 12/10/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/10/2019 | | 12/10/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/10/2019 | | DONE |
|
|
|
Plans passed with review comments.
|
Permit Ready to Issue | | | 12/10/2019 | | DONE |
|
|
|
MET
|