INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Jim Page
|
|
|
As-builts have been updated and now reflect what is installed. Final fire alarm inspection is complete.
Phone #: ###-#### Inspection requested via web by Neal Timmerman
|
CHANGE STATUS TO (ISS) | | | 4/16/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/14/2020 | | 4/15/2020 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 4/15/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 4/15/2020 | | 4/15/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/15/2020 | | DONE |
|
|
|
As built. No fee.
|
Permit Ready to Issue | | | 4/15/2020 | | DONE |
|
|
|
as built met
|
Plan resubmittals received | | | 4/14/2020 | | DONE |
|
|
|
Work flow request to be opened for as builts
|
INSP-Final Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PART |
Troy Cobbley
|
|
|
A temp per Joe is approved until the 110cd device is changed to 15cd and as-builts/plan mods are approved for changing the Conference Room strobe from 15cd to 30cd
Brian Phone #: ###-####
|
Issue and Print Permit | | | 12/20/2019 | | DONE |
|
|
|
|
Application received | | | 12/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2019 10:58AM
|
Plan assigned to (Lee) | 12/19/2019 | | 12/19/2019 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 12/19/2019 | | PASS |
|
|
|
|
1st review completed | | | 12/19/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/19/2019 | | 12/19/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/19/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 12/19/2019 | | DONE |
|
|
|
met
|