INSP-Final Inspection | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping is ok for cover.
**stated No to all questions about traveling or being sick*** Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PART |
Jim Page
|
|
|
City approved drawings has been notated with red ink areas approved for cover.
didn''t leave # & came up as unknow // Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | P | PART |
Jim Page
|
|
|
City approved drawings has been notated with red ink areas approved for cover.
Colin Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above notated hardlids complete, city approved plans have been marked with red ink hardlids approevd for cover.
TOM SMALL Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Issue and Print Permit | | | 12/24/2019 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/20/2019 | | 12/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 12/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/23/2019 | | DONE |
|
|
|
met
|
Intake Approval | | | 12/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 12/20/2019 | | 12/20/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 12/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2019 12:26PM
|