INSP-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work is complete.
Contact Tanner Loomis ###-#### 30 min prior to Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping in area of work complete. A follow up inspection will be required before cover can be approved after finish pendant heads are installed.
Contact is Tanner Loomis please call him 30 mins before inspections. Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
Application received | | | 1/30/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2020 6:48AM
|
Intake Approval | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/30/2020 | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/30/2020 | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/30/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/30/2020 | | DONE |
|
|
|
|