INSP-Final Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
LONNIE Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Plan Modification Accepted | | | 6/19/2020 | | DONE |
|
|
|
Brodie from Treasure valley requested a plan mod workflow
|
Plan assigned to (Stumbaugh) | 6/19/2020 | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 6/19/2020 | | 6/19/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review time 1hr
2 new devices
|
Permit Ready to Issue | | | 6/19/2020 | | DONE |
|
|
|
plan mod
|
Intake Approval | | | 2/6/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/6/2020 | | 2/6/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/6/2020 | | 2/6/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/6/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/6/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 2/6/2020 | | DONE |
|
|
|
|
Application received | | | 2/5/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2020 2:25PM
|