INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Final Inspection | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | CANC |
Jim Page
|
|
|
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler pipe has been witnessed, no pressure loss observed at riser provided gauge.
|
INSP-Sprinkler Rough-in | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete, all tenting in place at time of inspection. Cover is approved, cover approval sticker has been placed.
rough in and tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
CHANGE STATUS TO (ISS) | | | 5/19/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 5/15/2020 | | 5/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
as builts
|
Sprinkler Plan Check | 5/18/2020 | | 5/18/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2020 | | DONE |
Mark Stumbaugh
|
|
|
As built drawings
No review required
|
Permit Ready to Issue | | | 5/18/2020 | | DONE |
|
|
|
as built approved
|
Plan resubmittals received | | | 5/15/2020 | | DONE |
|
|
|
Easton requested the workflow to be opened for as builts.
|
Issue and Print Permit | | | 3/20/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/24/2020 | | 2/28/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/28/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/28/2020 | | DONE |
|
|
|
met
|
Application received | | | 2/24/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2020 9:24AM
|
Intake Approval | | | 2/24/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/24/2020 | | 2/24/2020 | | DONE |
Mark Stumbaugh
|
|
|
|