INSP-Final Inspection | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, rough to cover inspection for overhead fire sprinkler piping in scope of work is complete, scope of work approved for cover.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | FAIL |
Troy Cobbley
|
|
|
Installation does not match plans. Two heads have been piped from the same 1" outlet. Install per plans or provide calculations proving the two heads work as discussed.
Please call Barry when you are on your way. Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | FAIL |
Troy Cobbley
|
|
|
I let jim know I was on the way. Waited at the project site 25 minutes and then left. Inspection will need to be rescheduled. Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | CANC |
Troy Cobbley
|
|
|
Tried to coordinate twice but it was not to be. Will need to be rescheduled.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
Issue and Print Permit | | | 3/19/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/17/2020 | | 3/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/17/2020 | | 3/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
met
|
Application received | | | 3/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2020 4:27PM
|