INSP-Final Inspection | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Jim Page
|
|
|
Plans have been submitted, install matches city approved drawings, final inspection is complete.
Kenny Caldwell is the contact. Thanks for all your help! Phone #: ###-#### Inspection requested via web by Stan Beus
|
CHANGE STATUS TO (ISS) | | | 4/6/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 4/2/2020 | | 4/3/2020 | | DONE |
Mark Stumbaugh
|
|
|
as built
|
Sprinkler Plan Check | 4/3/2020 | | 4/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1 hr
No new devices
|
Permit Ready to Issue | | | 4/3/2020 | | DONE |
|
|
|
**AS BUILT - DO NOT REISSUE**
|
INSP-Final Inspection | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete, install is per NFPA13, pipe sizing is different than what was submitted, need to verify pipe sizing will work or corrections will be required.
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Jim Page
|
|
|
Rough in inspection for scope of work is complete, will need to verify pipe size changes will work for application, pipe sizing is different than what was submitted.
Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan resubmittals received | | | 4/2/2020 | | DONE |
|
|
|
Kyle requested an as built work flow to be opened.
|
INSP-Sprinkler Rough-in | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Kenny Caldwell is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Kenny Caldwell is the contact. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | CANC |
Jim Page
|
|
|
Kenny Caldwell is the contact. Thanks(: Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Issue and Print Permit | | | 3/18/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 3/17/2020 | | 3/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 3/17/2020 | | 3/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 3/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/17/2020 | | DONE |
|
|
|
met
|
Application received | | | 3/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2020 8:41AM
|