Permit Information
Permit NumberFIR20-00295
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 4866 N CORRALERO LN
Project NameHACKBERRY NORTH LOT 18
Customer Number 
ePlanReviewYes
Description
THORPE FIRE SPRINKLER SYSTEMS TO INSTALL A NEW NFPA 13D FIRE SPRINKLER SYSTEM IN THIS NEW SINGLE FAMILY DWELLING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/15/20207/16/20207/16/2020APASS
DetailsJim Page
Final fire sprinkler inspection is complete, irrigation was not installed but sprinkler timer was, wiring for irrigation shutdown was correct at time of inspection.

Call James before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in5/7/20205/8/20205/8/2020APASS
DetailsJim Page
All tenting in place at time of inspection, rough to cover inspection is complete, sticker placed for cover approval.

Tenting inspection, call James before heading out! Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/6/20205/6/20205/6/2020PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.

Ready any time. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in5/6/20205/6/20205/6/2020PPART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping is complete, piping between conditioned spaces is approved for cover, sprinkler piping requiring tenting to be inspected after tenting is installed.

Permit Ready to Issue  4/29/2020 DONE
Issue and Print Permit  4/29/2020 DONE
Intake Approval  4/28/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)4/28/2020 4/28/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check4/28/2020 4/28/2020 PASS
DetailsMark Stumbaugh
1st review completed  4/28/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/28/2020 DONE
DetailsMark Stumbaugh
Application received  4/27/2020 DONE
Application submitted via PDS Online on Apr 27 2020 1:03PM