Permit Information
Permit NumberFIR20-00361
StatusIssued
Name TRIBAL FIRE SYSTEMS
Site Address 700 S CLEARWATER LN
Project NameMarvell Clearwater TI
Customer Number 
ePlanReviewYes
Description
overhead fire suppression system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit Ready to Issue  7/29/2020 DONE
**DO NOT REISSUE - PLAN MOD**
Issue and Print Permit  7/29/2020 DONE
Plan resubmittals received  7/28/2020 FAIL
DetailsMark Stumbaugh
Instead of updated files being uploaded.
Files with different file names are repeatingly being uploaded.
Updated files that version original files need to be uploaded.
Plan resubmittals received  7/28/2020 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/28/2020 7/28/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  7/28/2020 DONE
DetailsMark Stumbaugh
review time 4 hrs total
no new devices
Plan resubmittals received  7/27/2020 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  7/24/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check7/24/2020 7/24/2020 FAIL
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)7/22/2020 7/23/2020 DONE
DetailsMark Stumbaugh
plan mod to show flex whips
Sprinkler Plan Check7/23/2020 7/23/2020 FAIL
DetailsMark Stumbaugh
Plan Modification Accepted  7/22/2020 DONE
plan mod
INSP-Sprinkler Rough-in7/16/20207/16/20207/16/2020PFAIL
DetailsJim Page
Plans will need to be re-submitted to show use of flex drops in the grid ceiling. Add head where duct work is blocking coverage on first floor, notated on city approved drawing. Add sway brace that was not installed on level 2. Space under first floor stairs appears to be a combustible concealed pocket, if area is combustible then heads will have to be added or filled with non-combustilble insulation as discussed. Add upright head under duct work as notated on city approved drawings.

Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia McLain
INSP-Sprinkler Rough-in7/6/20207/7/20207/7/2020APASS
DetailsTroy Cobbley
1st floor piping above the hardlids, as marked on the plans, is ok for cover.

Please call Chris Ford rough-in on the 1st floor please Phone #: ###-#### Inspection requested via web by Jessia McLain
Issue and Print Permit  6/15/2020 DONE
Plan resubmittals received  6/12/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check6/12/2020 6/12/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  6/12/2020 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  6/12/2020 DONE
Sprinkler Plan Check6/10/2020 6/11/2020 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  6/10/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check6/4/2020 6/9/2020 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  6/4/2020 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check5/27/2020 6/3/2020 FAIL
DetailsMark Stumbaugh
1st review completed  6/3/2020 FAIL
DetailsMark Stumbaugh
Intake Approval  5/27/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)5/27/2020 5/27/2020 DONE
DetailsMark Stumbaugh
Intake Approval  5/26/2020 FAIL
DetailsMark Stumbaugh
Need more detailed description of work.
Checklist needs to be filled out completely.
Application received  5/21/2020 DONE
Application submitted via PDS Online on May 21 2020 3:12PM