Meeting | | | 10/10/2019 | | DONE |
|
|
|
parcel hold on 9-25-19 for working without permits on Electrical per Eric S. double fee added to ELE19-03907
|
BLD-Conference | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | DEFR |
Jim Storey
|
|
|
BLD19-00877 Issued Permit for a roof replacement work to include: Removing existing failing roof structure and replace with P.E. roof trusses. All work per plans, notations, attachments, truss engineering, local codes & ordinances. Seperate electrical and mechanical permits. **MDH**
|
ELE-Conference | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | FAIL |
Eric Story
|
|
|
Stop work order put in place, could not access home and have conference with other contractor who denied to do the work. MIS will be ordered for other trades
|
Override - Parcel Holds | | | 9/25/2019 | | |
|
|
|
|
Override - Parcel Holds | | | 9/25/2019 | | |
|
|
|
|
Application received | | | 9/24/2019 | | |
|
|
|
|
Issue Misc Permit............ | | | 9/24/2019 | | DONE |
|
|
|
|
PLM-Conference | 9/25/2019 | 9/25/2019 | | P | |
Eric Strole
|
|
|
|