BLD-Blower Door Test Results | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | DONE |
Tell Riley
|
|
|
4.01 ACH 50
|
BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Gorge Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still need fall prevention devices on windows in master bedroom//ACH is still not posted//
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//need blower door test results posted// need child fall prevention devices on two windows in master--under 24" sill height//fix vapor barrier in crawl//
|
BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still needs mechanical final prior to final inspection//left correction notice with owner onsite//
|
BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | NH |
Tell Riley
|
|
|
Gorge Phone #: ###-####//doors are all locked//no access to house for inspection//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Tell Riley
|
|
|
Charlie Phone #: ###-####//needs plumbing, electrical and mechanical finals//left message with contact and sent text message//
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | DONE |
Dave Hannah
|
|
|
george Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Dave Hannah
|
|
|
garage // george Phone #: ###-####
|
BLD-Footing | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PART |
Jim Sly
|
|
|
Charlie Phone #: ###-#### Garage footing...OK.
|
BLD-Energy code compliance | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | FAIL |
Jim Sly
|
|
|
George Phone #: ###-#### Need approved plans...... install hold downs per approved plan....insulate all piping...........Do Not Insulate.
|
BLD-Wall Bracing | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Brandon Shaw
|
|
|
All hold downs to be installed before framing rough-in... Work in progress
|
BLD-Footing | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|