BLD-Blower Door Test Results | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | DONE |
Tell Riley
|
|
|
6.1 ACH 50
|
BLD-Final | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Gorge Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/14/2019 | 11/15/2019 | 11/15/2019 | P | CANC |
Tell Riley
|
|
|
Charlie Phone #: ###-####//still needs fireplace final//
|
BLD-Final | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | CANC |
Tell Riley
|
|
|
George Phone #: ###-####//spoke with George--still needs mechanical final for the gas fireplace//
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//need blower door test results posted//
|
BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | FAIL |
Tell Riley
|
|
|
George Phone #: ###-####//still need final for mechanical and gas fireplace prior to final inspection//left correction notice with owner onsite//
|
BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | NH |
Tell Riley
|
|
|
Gorge Phone #: ###-####//no access to house//all doors are locked//
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Tell Riley
|
|
|
Charlie Phone #: ###-####//need plumbing, mechanical, electrical finals//left message with contact and sent text message//
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | DONE |
Dave Hannah
|
|
|
george Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Dave Hannah
|
|
|
garage // george Phone #: ###-####
|
BLD-Footing | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Jim Sly
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | NR |
Mike Jordan
|
|
|
JR Phone #: ###-####
|
BLD-Framing/Rough-in | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Charley Phone #: ###-####
|
BLD-Energy code compliance | 12/21/2018 | 12/24/2018 | 12/24/2018 | A | NR |
Jim Sly
|
|
|
Charlie Phone #: ###-#### Complete stair corrections.
|
BLD-Framing/Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PART |
Jim Sly
|
|
|
Charlie Phone #: ###-#### C/N Non complying Winder stairs.
|
BLD-Wall Bracing | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Footing | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | NR |
Jim Sly
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 9/11/2018 | 9/13/2018 | 9/13/2018 | P | NR |
Jim Sly
|
|
|
JR Phone #: ###-####
|