Permit Information
Permit NumberBLD18-04243
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 592 N BENJAMIN LN
Project NameAmherst Madison Bldg Shell/Cor
Customer NumberBLD18-04369
ePlanReviewYes
Description
**TWO PERMITS IN EPLAN UNDER BLD18-04243** (AMHERST MADISON OFFICE BUILDING SHELL/CORE) (CUP18-00014) (DRH18-00061) Permit to construct a new 2-story, 13,504 sq ft office building and related site improvements. Tenant improvement for Amherst Madiston Real Estate Office under BLD18-04369. Work to include: construction of slab on grade concrete foundation, interior non-bearing tenant demising wall, electrical, mechanical, plumbing, and interior finishes to be in compliance with Ch. 8 of the 2015 IBC. Two-way communication is required at the elevator landing in accordance with 2015 IBC 1009.8. All work shall comply with the approved plans, DRH18-00061 and all applicable codes. This building is NOT Fire Sprinklered. Note: Special Inspections Required, see two attached Form 310s. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20205/11/20205/11/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
DOC - Permit Finaled5/11/20205/11/20205/11/2020PPASS
DetailsMike Jordan
BLD-Conference5/6/20205/6/20205/6/2020PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Final5/4/20205/4/20205/4/2020PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
FIRE-Final Inspection5/4/20205/4/20205/4/2020PPASS
DetailsTroy Cobbley
Life safety passed.

screeened // Jerrod Phone #: ###-####
FIRE-Final Inspection4/29/20204/30/20204/30/2020PFAIL
DetailsTroy Cobbley
Permit can be finaled when the project related fire alarm permit and the Grading permit have been finaled. Jared Phone #: ###-####
BLD-Ceiling Grid Inspection3/25/20203/26/20203/26/2020PPASS
DetailsMike Jordan
2nd floor 3 west offices ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020PPART
DetailsMike Jordan
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
BLD-Ceiling Grid Inspection3/16/20203/17/20203/17/2020PPASS
DetailsMike Jordan
First floor ceiling grid Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in3/4/20203/4/20203/4/2020PPASS
DetailsMike Jordan
2nd floor cloud ceiling framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/17/20202/18/20202/18/2020AFAIL
DetailsMike Jordan
1st floor west exterior interior shear Phone #: ###-#### Inspection requested via web by Jared Waggoner. Engineer of record to provide alternate attachment details for areas that are inaccessable to provide attachments.
BLD-Framing/Rough-in2/12/20202/13/20202/13/2020APASS
DetailsMike Jordan
First floor suspended GWB ceiling and 2 exterior canopies for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/10/20202/11/20202/11/2020APASS
DetailsMike Jordan
2nd floor east interior shear wall for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Energy code compliance2/10/20202/10/20202/10/2020APASS
DetailsMike Jordan
2nd floor E/W/S exterior wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner. Remainder of 2nd floor exterior walls ok.
BLD-Energy code compliance2/7/20202/7/20202/7/2020PPASS
DetailsMike Jordan
Foreman Phone #: ###-####. North exterior wall only ok.
BLD-Framing/Rough-in2/6/20202/6/20202/6/2020PPASS
DetailsMike Jordan
2nd floor walls and ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPART
DetailsTony Young
Framing inspection for 1 side cover at 2nd floor interior walls. Phone #: ###-#### Inspection requested via web by Jared Waggoner,, interior wall ok to cover one side from 10 foot up to deck pending trades
BLD-Energy code compliance1/23/20201/24/20201/24/2020APASS
DetailsJim Storey
First Floor wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in1/22/20201/22/20201/22/2020PPASS
DetailsMike Jordan
First floor rough framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. 1st floor interior steel stud walls ok. Hardlids ok pending mech. rough in inspection.
BLD-Wall Bracing1/13/20201/13/20201/13/2020PPASS
DetailsMike Jordan
90% partial exterior sheet metal shear inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in12/30/201912/30/201912/30/2019PPASS
DetailsMike Jordan
Above roof deck wall framing for cover. Phone #: ###-#### Inspection requested via web by Jared Waggoner. Parapet framing on roof deck at east and west stair towers and pedestal framing for HVAC equipment.
BLD-Concrete11/14/201911/15/201911/15/2019APART
DetailsMike Jordan
2nd floor slab on deck reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner. 2nd. floor slab on deck. work in progress. Needs to install perimeter #4 bar and splice 15ft. at re-enterant corners. Special inspection to verify.
BLD-Other11/4/201911/4/201911/4/2019PDEFR
DetailsMike Jordan
8" CMU grout at east patio walls 12''-16'' at 2:30 pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Other10/31/201911/1/201911/1/2019PPEND
DetailsMike Jordan
CMU grout from 8''-12'' at 1pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. Pending special inspection.
BLD-Other10/30/201910/31/201910/31/2019PPART
DetailsMike Jordan
4''-8'' CMU grout at 3pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. 4ft. to 8ft. elevation for CMU wall at patio.4ft. to 8ft. elevation for CMU wall at patio.
BLD-Other10/30/201910/31/201910/31/2019ADEFR
DetailsMike Jordan
0''-4'' CMU grout at 10am, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Concrete10/16/201910/17/201910/17/2019PPASS
DetailsMike Jordan
Slab on Grade Reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Foundation9/27/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
Ok to place concrete pending special inspection.
BLD-Footing9/18/20199/18/20199/18/2019PPART
DetailsMike Jordan
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.