Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-04369
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 592 N BENJAMIN LN
Project NameAmherst Madison Office TI
Customer NumberEPLAN BLD18-04243
ePlanReviewNo
Description
**TWO PERMITS IN EPLAN UNDER BLD18-04243** (AMHERST MADISON REAL ESTATE OFFICE TI) (CUP18-00014) (DRH18-00061) // 01/02/20 PLAN MOD TO ENLARGE 2ND FLR RESTROOMS, ADD OFFICE DOORS. JAR // Permit to establish occupancy for a new 11,014 sq ft office tenant space in a new 2-story office building constructed under BLD18-04243. Work to include: interior non-bearing partition walls, doors and interior relites; electrical, plumbing, and mechanical; and interior finishes in compliance with Ch. 8 of the 2015 IBC. Two-way communication is required at the elevator landing in accordance with 2015 IBC 1009.8. All work shall comply with the approved plans, and all applicable codes. This building is NOT Fire Sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20205/11/20205/11/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner. Ok for perm occ.
BLD-Conference5/6/20205/6/20205/6/2020PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Final5/4/20205/4/20205/4/2020PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Jared Waggoner
FIRE-Final Inspection5/4/20205/4/20205/4/2020APASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Jared Waggoner
FIRE-Final Inspection4/29/20204/30/20204/30/2020PFAIL
DetailsTroy Cobbley
Permit can be finaled when the project related fire alarm permit and the Grading permit have been finaled. Jared Phone #: ###-####
BLD-Ceiling Grid Inspection3/25/20203/26/20203/26/2020PPASS
DetailsMike Jordan
2nd floor 3 west offices for ceiling cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020PPART
DetailsMike Jordan
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
BLD-Ceiling Grid Inspection3/16/20203/17/20203/17/2020PPASS
DetailsMike Jordan
First floor ceiling grid Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in3/4/20203/4/20203/4/2020PPASS
DetailsMike Jordan
2nd floor cloud ceiling framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/17/20202/18/20202/18/2020AFAIL
DetailsMike Jordan
Ist floor west exterior wall interior shear Phone #: ###-#### Inspection requested via web by Jared Waggoner. Engineer of record to provide alternate attachment details for areas that are inaccessable to provide attachments.
BLD-Framing/Rough-in2/12/20202/13/20202/13/2020APASS
DetailsMike Jordan
First floor suspended GWB ceiling and 2 exterior canopies for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Wall Bracing2/10/20202/11/20202/11/2020APASS
DetailsMike Jordan
2nd floor east interior shear wall Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Energy code compliance2/10/20202/10/20202/10/2020APASS
DetailsMike Jordan
2nd floor E/W/S exterior wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner. Remainder of 2nd floor exterior walls ok.
BLD-Energy code compliance2/7/20202/7/20202/7/2020PPASS
DetailsMike Jordan
Foreman Phone #: ###-####. North exterior wall only ok.
BLD-Framing/Rough-in2/6/20202/6/20202/6/2020PPASS
DetailsMike Jordan
2nd floor walls and ceilings for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPART
DetailsTony Young
Framing inspection for 1 side at interior 2nd floor walls Phone #: ###-#### Inspection requested via web by Jared Waggoner/// ok to one side from 10' up pending trades
BLD-Energy code compliance1/23/20201/24/20201/24/2020APASS
DetailsJim Storey
First floor wall insulation Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Framing/Rough-in1/22/20201/22/20201/22/2020PPASS
DetailsMike Jordan
First floor rough framing for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. 1st. floor i nterior steel stud framed walls ok. hardlids ok pending mech. rough in inspection.
BLD-Wall Bracing1/13/20201/13/20201/13/2020PPASS
DetailsMike Jordan
90% exterior sheet metal shear inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Concrete11/14/201911/15/201911/15/2019APART
DetailsMike Jordan
2nd floor slab on deck reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner. 2nd. floor slab on deck. work in progress. Needs to install perimeter #4 bar and splice 15ft. at re-enterant corners. Special inspection to verify.
BLD-Other11/4/201911/4/201911/4/2019PDEFR
DetailsMike Jordan
8" CMU grout at east patio walls at 2:30 pm 12''-16'', will have special inspection. Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Other10/31/201911/1/201911/1/2019PPEND
DetailsMike Jordan
CMU grout from 8''-12'' at 1pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. PEnding special inspection.
BLD-Other10/30/201910/31/201910/31/2019PPART
DetailsMike Jordan
4''-8'' CMU grout at 3pm, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner. 4ft. to 8ft. elevation for CMU wall at patio.
BLD-Other10/30/201910/31/201910/31/2019ADEFR
DetailsMike Jordan
0-4'' CMU grout at 10am, will have special inspection Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Concrete10/16/201910/17/201910/17/2019PPASS
DetailsMike Jordan
Slab on Grade Reinforcement Phone #: ###-#### Inspection requested via web by Jared Waggoner
BLD-Foundation9/27/20199/27/20199/27/2019PPASS
DetailsBrandon Shaw
Ok to place concrete pending special inspection.
BLD-Footing9/18/20199/18/20199/18/2019PPART
DetailsMike Jordan
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.