FIRE-Final Inspection | 8/13/2020 | 8/13/2020 | 8/13/2020 | A | PASS |
Greg Ruxton
|
|
|
Passed Fire Life Safety.
Fire/Life Safety Inspection for Occupancy. Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 4/10/2020 | 4/13/2020 | 4/13/2020 | A | PASS |
Mike Jordan
|
|
|
Ceiling drops framing inspection for cover, Building 11 - Tower 3 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Wall cover | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Mike Jordan
|
|
|
Cover inspection for ceiling drops framing in Building 11 - Tower 2 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Mike Jordan
|
|
|
Insulation and RC inspection for cover in Building 11 -Tower 3 (North 12 units) Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Mike Jordan
|
|
|
Energy Seal, Fire Caulking ; Framing for cover at Building 11 - Tower 3. (North 12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | FAIL |
Mike Jordan
|
|
|
Energy Seal, Fire Caulking ; Framing for Cover of Building 11 - Tower 3 (North 12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Ceiling Grid Inspection | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Dave Hannah
|
|
|
tower 1 // Chris Phone #: ###-#### fur downs ok to cover
|
BLD-Energy code compliance | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PASS |
Mike Jordan
|
|
|
chris Phone #: ###-####. Gyp added behind ADA tub and blocking added.
|
BLD-Framing/Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Tell Riley
|
|
|
tower 2 // Chris Phone #: ###-#### Inspection requested via web by Brittany Hill//fire caulk added as we walked through//need gyp board behind ada shower//add blocking for ada bathroom units 105 and 106//ok to insulate//
|
BLD-Energy code compliance | 2/23/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Mike Jordan
|
|
|
RC channel and insulation inspection for cover in Tower 1. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Mike Jordan
|
|
|
Energy Seal, Fire Caulking ; Framing Building 11 - Tower 1. Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | NR |
Mike Jordan
|
|
|
Building 11 tower 1 Framing, Fire Caulking, Energy Seal. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | NR |
Mike Jordan
|
|
|
Building 11 tower 1 Framing, Fire Caulking, Energy Seal. Phone #: ###-#### Inspection requested via web by Kris Linnell. moved to pm.
|
BLD-Framing/Rough-in | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Mike Jordan
|
|
|
South East End Walls framing for cover for plumbing fur out wall. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | PASS |
Mike Jordan
|
|
|
Framing inspection at tubs ; showers for insulation and pre-rock. Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Wall cover | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Mike Jordan
|
|
|
Building 11, Gridline 7, 2-hr wall second layer joint overlaps Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PART |
Brandon Shaw
|
|
|
Gridline 7, 2-hr wall insulation OK to cover...
|
BLD-Framing/Rough-in | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | PART |
Tony Young
|
|
|
Framing inspection of Gridline 7 for 2hr Firewall, prior to insulation. Phone #: ###-#### Inspection requested via web by Bob Goodwin// ok to cover
|
BLD-Conference | 12/10/2019 | 12/12/2019 | 12/12/2019 | A | DONE |
Mike Jordan
|
|
|
Fire Caulking and Fire Proofing Conference with GC and Sub-contractors at 9:00 A.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Mike Jordan
|
|
|
Full exterior shear inspection for weather barrier cover. Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st. 2nd. and 3rd. floor exterior shear and exterior floor to floor straps. interior holdowns and anchor bolts as well ok. Still need interior floor to floor straps.
|
BLD-Framing/Rough-in | 11/25/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Mike Jordan
|
|
|
Shear inspection only in breezeways for Pre-Rock Cover. Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st, 2nd, and 3rd floor breezeways only ok.
|
BLD-Concrete | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Mike Jordan
|
|
|
North Half of Building 11 Slab and interior thicken footings reinforcement Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Concrete | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Mike Jordan
|
|
|
South Half of Building 11 Building slab. Phone #: ###-#### Inspection requested via web by Kris Linnell. Interior thickend footings and column pad footings ok.
|
BLD-Energy code compliance | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Mike Jordan
|
|
|
North Half of building 11 stem wall insulation. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Energy code compliance | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Mike Jordan
|
|
|
Stem wall insulation on North Half of building 11. Phone #: ###-#### >> Inspection requested via web by Kris Linnell Inspection cancelled from web by: Kris Linnell
|
BLD-Energy code compliance | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Mike Jordan
|
|
|
South Half of building 11 energy code compliance for stem wall insulation. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Footing | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Mike Jordan
|
|
|
North Half Building 11 footing rebar inspection. Concrete scheduled for 11:45 A.M.- Third Party inspector scheduled onsite for pour. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Foundation | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | DEFR |
Mike Jordan
|
|
|
Building 11- South Half Stem Walls Inspection requested via web by Kris Linnell. Ok to place concrete pending speciial inspection..
|
BLD-Footing | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Mike Jordan
|
|
|
gridline 1 through gridline 5 // Bob Phone #: ###-####. exterior and breezeway footings, south half, work in progress. Ok to place concrete pending special inspection.
|