BLD-Final | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Dave Hannah
|
|
|
*Screened* - Jim Phone #: ###-#### ok after zoning finals
|
FIRE-Final Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jim Phone #: ###-####
|
BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PART |
Jim Storey
|
|
|
leonard Phone #: ###-#### final ok pending fire/zonning for perm.
|
FIRE-Final Inspection | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Jim Page
|
|
|
Per conversation with Troy Cobbley, 90 Day TCO authorized by Ron Johnson with Boise Fire, signature provided on permit card for 90 day TCO.
Lenor Phone #: ###-####
|
BLD-Conference | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | DONE |
Brandon Shaw
|
|
|
pre-final walk-through // Leonard Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and small docuements, provide above ground tank as per review notes #5, #6 and #7, the impact protection for the tank does not appear to meet IFC 312, provide building and elevator keys for knox box, provide fire dept. access per review note #15. The above items and not all inclusive due to no plans and notes available. Other items may be noted at next inspection.
Lenard Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Jim Storey
|
|
|
2nd floor and lobby
|
BLD-Framing/Rough-in | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Jim Storey
|
|
|
first floor ok
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Jim Storey
|
|
|
fire treated ply
|
BLD-Concrete | 8/1/2019 | 8/2/2019 | 8/2/2019 | P | PASS |
Jim Storey
|
|
|
Inspection for slab on metal deck Phone #: ###-#### Inspection requested via web by leonard loewen
|
BLD-Concrete | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Jim Storey
|
|
|
Inspect reinforcement on slab on grade Phone #: ###-#### Inspection requested via web by leonard loewen
|