Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD19-00532
StatusIssued
Name ESI
Site Address 11950 W FAIRVIEW AVE
Project NameVillage East - Building H
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (BUILDING H – VILLAGE EAST APARTMENTS – RESIDENTIAL) (PUD18-00042) (DRH18-00528) The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 43,220 square foot, 4 story apartment building (10,805 square foot 1st story, 10,805 square foot 2nd story, 10,805 square foot 3rd story, and 10,805 square foot 4th story) with a total of 36 dwelling units (9 on each story). Because there is an elevator in this building, all dwelling units on all stories are required to comply as Type B dwelling units (1 is also required to comply as Type A). Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with thickened slab at interior bearing walls and R-10 perimeter slab edge insulation between conditioned and unconditioned spaces, concrete elevator pit, 2x6 walls between conditioned and unconditioned spaces with R-20 cavity insulation and R-3.8 continuous insulation, wood columns, shear walls with gypsum panels or structural wood panels and hold downs, an unconditioned 1-hr fire-resistance-rated corridor on each story, two unconditioned 2-hr fire-resistance-rated exterior stairways, a 2-hr masonry elevator shaft, 1-hr dwelling unit separation walls between dwelling units, draftstops in the attic, 1-hr dwelling unit separation floors between dwelling units, engineered wood truss roof system with a structural wood panel roof deck and R-49 insulation installed on top of the ceiling with the attic vented to the outside, roof overbuilds, ladder and roof hatch to access roof top heat pumps, exterior windows, interior doors between conditioned and unconditioned spaces, exterior cementitious lap siding, exterior brick veneer, exterior stucco, guards, handrails, asphalt shingles, 3-ply roofing membrane at flat roof areas, roof drains and overflow drains, interior millwork, an elevator, and interior finishes. Special Inspection is required for masonry. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing7/9/20207/10/20207/10/2020ANR
DetailsTell Riley
Hold downs Phone #: ###-#### Inspection requested via web by Lee Scott//several hold downs are incorrect size//hold downs for interior shear wall need installed//
BLD-Energy code compliance7/7/20207/7/20207/7/2020PPART
DetailsTell Riley
Check insulation at pre rock areas for tubs Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st through 3rd floor ok for tub areas//4th floor not accesible at time of inspection//
BLD-Framing/Rough-in6/30/20207/1/20207/1/2020APART
DetailsTell Riley
Pre rock areas for tubs and plumbing walls Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts 1st floor as discussed//add studs where needed//pending electrical in areas to be covered//
BLD-Framing/Rough-in6/24/20206/25/20206/25/2020APART
DetailsTell Riley
Start checking trusses at 4th floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//trusses were reviewed, one truss backward, one truss brace on wrong web, add nails to all hangers//provide clarificationf for hangers on 4 corners that spec to be installed upside down-and complete install//add H2.5s at corridor exterior bearing walls according to truss docs//
BLD-Wall Bracing4/20/20204/21/20204/21/2020APART
DetailsTell Riley
Inspection for missed straps at south balconies for exterior cover. Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior straps nailed and exterior nailing ok//still need to check other hardware//
BLD-Framing/Rough-in4/20/20204/21/20204/21/2020APART
DetailsTell Riley
Partial framing inspection for 2hr lid in west corridor Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to install shaft liner//
BLD-Wall Bracing4/8/20204/10/20204/10/2020APART
DetailsTell Riley
Inspection for floor to floor strapping and roof tie downs for cover of upper level roof eves with fire protection sheetrock Phone #: ###-#### Inspection requested via web by Travis Blackburn// north and west walls only, exterior strapping and nailing ok// eaves ok where h2.5s installed//
BLD-Wall Bracing4/2/20204/3/20204/3/2020PPART
DetailsTell Riley
Shear panels only on exterior of bldg. Hardware next week Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add hot dip galvanized nails at coridors, and areas marked//will check hardware in next inspection//
BLD-Aging Inspection3/31/20203/31/20203/31/2020 PASS
DetailsTell Riley
WIP
BLD-Concrete12/17/201912/18/201912/18/2019APEND
DetailsTell Riley
We are pouring the patios for building H and L tomorrow at 11. Would like inspection before that. Phone #: ###-#### Inspection requested via web by Matt Perry//poured early--specials onsite//pend specials//
BLD-Concrete11/18/201911/18/201911/18/2019PPASS
DetailsTell Riley
Pouring the corridor for building H tomorrow morning at 6:30am Phone #: ###-#### Inspection requested via web by Matt Perry//ok pending specials//
Extend Permit 90/180 days11/14/201911/15/201911/15/2019PCANC
DetailsTell Riley
The slab for building H will be poured on Monday at 6:30am. Would like to get it inspected Friday late afternoon. Phone #: ###-#### Inspection requested via web by Matt Perry
BLD-Concrete11/14/201911/15/201911/15/2019PPASS
DetailsTell Riley
The slab for building H will be poured on Monday at 6:30am. Would like to get it inspected Friday late afternoon. Phone #: ###-#### Inspection requested via web by Matt Perry//pending specials//
BLD-Concrete11/14/201911/14/201911/14/2019PPEND
DetailsDave Hannah
The slab for building H will be poured on Monday at 6:30am. Would like to get it inspected Friday late afternoon. Phone #: ###-#### Inspection requested via web by Matt Perry
BLD-Concrete10/30/201910/31/201911/1/2019PPASS
DetailsDave Hannah
Pouring the stem walls at 7am Friday 11/1. Phone #: ###-#### Inspection requested via web by Matt Perry
BLD-Concrete10/29/201910/30/201910/30/2019PNR
DetailsTell Riley
Stem wall inspection and footing for elevator shaft inspection. Pour will be Friday 11/1. Phone #: ###-#### Inspection requested via web by Matt Perry//not ready//will reschedule//
BLD-Footing10/21/201910/22/201910/22/2019APART
DetailsTell Riley
Pour time is at 1pm. Thanks Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
BLD-Footing10/21/201910/21/201910/21/2019PCANC
DetailsTell Riley
Late inspection requested. Concrete pour is early Tuesday morning and crew will be forming and tying bar all day. Phone #: ###-#### >> Inspection requested via web by Travis Blackburn Inspection cancelled from web by: Travis Blackburn