BLD-Final | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
Dave Hannah
|
|
|
*Screened* Damon, call for access code Phone #: ###-####
|
DOC - Permit Finaled | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | P | FAIL |
Tell Riley
|
|
|
Damon - */Screened*/ Phone #: ###-####//need to have hard surface turnaround per plans or provide approval from zoning//currently only a 20 foot drive connected to common driveway//
|
BLD-Blower Door Test Results | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | DONE |
Tell Riley
|
|
|
5.9 ACH 50
|
BLD-Blower Door Test Results | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | CANC |
Tell Riley
|
|
|
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | FAIL |
Tell Riley
|
|
|
Daiman *cleared* Phone #: ###-####//still needs driveway or zoning approval//
|
BLD-Final | 4/7/2020 | 4/8/2020 | 4/8/2020 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan//CN issued//need to finish backfill around foundation on west and south side//need blower door test//need to post insulation certificate//need to complete shared driveway and turnaround or provide zoning approval//add house numbers to home//
|
BLD-Energy code compliance | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Brandon Shaw
|
|
|
East entry and North walls, OK to cover exterior only...
|
BLD-Framing/Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Tell Riley
|
|
|
damon Phone #: ###-####//corrections made from walk through//ok to insulate only//will need fireplace sign off prior to cover//
|
BLD-Framing/Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | NR |
Tell Riley
|
|
|
Damon Phone #: ###-####//need mechanical pass and fire place rough in passed//did a walk through and marked areas for anchor bolts and framing corrections//
|
BLD-Wall Bracing | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PART |
Tell Riley
|
|
|
Damon Phone #: ###-####//correction notice issued for hold down location that does not reflect location noted by engineer//other changes on garage ok per plans\\
|
BLD-Wall Bracing | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PART |
Tell Riley
|
|
|
shear // Damion Phone #: ###-####//nailing and hold downs ok per engineering provided//need engineers ok on window location and added door in garage//do not cover these areas//
|
BLD-Framing/Rough-in | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | NR |
Tell Riley
|
|
|
Bob Phone #: ###-####//need to submit new engineering for shear walls//call for re-inspection//
|
BLD-Conference | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | DONE |
Tell Riley
|
|
|
Damon Phone #: ###-####//questions on loft and a plan change///advised to submit a plan mod for approval//
|
BLD-Foundation | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Bob Archibald
|
|
|
Spoke with Clint From Boise Division Project II @ ###-####. Clint informed me that the approximate 4" enchroachment was acceptable.
|
BLD-Foundation | 8/19/2019 | 8/20/2019 | 8/20/2019 | A | PART |
Tell Riley
|
|
|
call half hour before to meet // damion Phone #: ###-####//discussed easment//no pins fpr easement--will need pins for easment or written confirmation of placement from canal company//notified Damion he can proceed at his own risk--we will still need confirmation from canal company for setbacks//he will notify me when written documentation is recieved//--per Bob
|
BLD-Footing | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | FAIL |
Tell Riley
|
|
|
damion Phone #: ###-####//no pins onsite observed for easment of canal// locate pins for easment verification and setback requirements//
|
BLD-Conference | 8/9/2019 | 8/12/2019 | 8/12/2019 | P | DONE |
Tell Riley
|
|
|
check on project..footings and wall may have been poured--footing inspection failed on 7/12/2019//footings and foundation have been poured//footing inspection failed on 7/12 (no pins to verify setbacks for canal easment)//correctin notice issued to locate pins and verify easement setbacks prior to continuing on preject//
|
BLD-Footing | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | FAIL |
Tell Riley
|
|
|
need to string easment line for canal//NE corner of house will be on easment line//call for re-inspection//
|
BLD-Conference | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | CANC |
Tell Riley
|
|
|
damion Phone #: ###-####
|