Permit Information
Permit NumberBLD19-00843
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 4795 W EMERALD ST
Project NameThe Commons Climbing Gym
Customer NumberBLD19-01136 INTERIOR DEMO
ePlanReviewYes
Description
(THE COMMONS CLIMBING GYM) (DRH19-00043) (BLD19-01136 INTERIOR DEMO) // 09/27/19 PLAN MOD TO REPLACE EAST EXTERIOR CMU WALL THAT COLLAPSED, SPECS FOR INTERIOR WALL FINISHES, AND APPROVED CODE ALTERNATE FOR 2ND ACCESSIBLE MEANS OF EGRESS. JAR // Permit to create an 11,107 sq ft building by building an addition to connect two existing buildings for a new rock climbing gym. Work to include: selective exterior demolition on both buildings; new exterior doors and storefront; new exterior walls to increase the building height on the north building to 45 ft; new roof structure; new floor structure; interior structure to support rock climbing walls; related site improvements; mechanical work including new RTUs; plumbing; electrical; remodeling the interior with new interior non-bearing partition walls, restrooms, stairs, and finishes in compliance with Ch. 8 of the 2015 IBC. Special inspections required per attached Form 310. This building will be fire sprinklered for height, area increase and A3 occupancy and fully alarmed. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 and NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20202/12/20202/12/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter
FIRE-Final Inspection2/11/20202/12/20202/12/2020APASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Zach Carter
FIRE-Final Inspection2/7/20202/10/20202/10/2020AFAIL
DetailsJim Page
Exit signage needs to match what was submitted on city approved drawings, provide code compliant hardware on NW exit door, riser room is not 1 hour fire rated due to multiple holes in wall, provide and install knox box. Mount fire extinguishers at max 48" to mechanism as discussed. Still need to verify emergency operation of all emergency lights. FIR permit for fire sprinklers must be finaled before life safety can be completed. GR


Phone #: ###-#### Inspection requested via web by Zach Carter
BLD-Final2/10/20202/10/20202/10/2020PCANC
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Zach Carter Inspection cancelled from web by: Zach Carter
BLD-Final2/7/20202/7/20202/7/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//need fire life safety, sprinkler and fire alarm finals// will need to reshedule//
BLD-Framing/Rough-in12/23/202012/24/20202/5/2020PPART
DetailsTell Riley
Per Tell, framing inspection put on Foundation permit. Switching it to BLD19-00843 2-5-2020 // new GB over existing framing//insulation ok, vapor barrier installed//no electrical or plumbing//
BLD-Conference12/12/201912/16/201912/16/2019ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//site walk through//accesible ramp to steep on outside of building--discussed options to make compliant//accessible ramp inside filled with insulation-talk with Troy about depth of fill//will need framing for tall building area prior to cover//
BLD-Conference11/12/201911/15/201911/15/2019ADONE
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Zach Carter//discussed RFI for ramp --approved as is by engineer for structural//discussed climbing wall structures and verifiying permits and special inspections//
FIRE-Conference11/12/201911/14/201911/14/2019PDONE
DetailsTroy Cobbley
We discussed possible combustible concealed spaces caused by the climbing wall construction. Phone #: ###-#### Inspection requested via web by Zach Carter
BLD-Framing/Rough-in11/7/201911/8/201911/8/2019APART
DetailsTell Riley
Zach Phone #: ###-####//need to provide mod for construction changes to ramp//vestibule, bathrooms ok when fire sprinklers have passed--discussed with Troy and advised Zach to schedule fire conference for areas behind rock walls//
BLD-Conference7/22/20197/24/20197/24/2019ADONE
DetailsTell Riley
Zack Phone #: ###-####//discuss project and advised Zack to submit plan changes to plan review for approval//
BLD-Foundation7/16/20197/17/20197/17/2019APASS
DetailsBrandon Shaw
Work in progress...
Pending special inspection...
BLD-Footing7/3/20197/3/20197/3/2019PPART
DetailsTell Riley
Zach Phone #: ###-####//concrete already poured//specials were completed to epoxy, rebar and concrete//