BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Dave Hannah
|
|
|
Miles Phone #: ###-#### ok for tco ok for perm oc after elec gos perm
|
FIRE-Final Inspection | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected. Fire sprinkler ispection is complete, fire alarm inspection is complete, hood suppression system inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Miles Phone #: ###-####
|
FIRE-Final Inspection | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | FAIL |
Jim Page
|
|
|
Verify emergency egress lighting on exterior is operational could not test at time of inspection, provide current egress plan as discussed with point of contact, approved drawings on site still showed kitchen exit sign above door. Provide maximum occupancy placard. GR miles Phone #: ###-####
|
BLD-Conference | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | DONE |
Dave Hannah
|
|
|
walk through // Miles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/9/2020 | 1/10/2020 | 1/13/2020 | P | PEND |
Dave Hannah
|
|
|
Miles Phone #: ###-#### still working on grid first layer of shaft repair ok
|
BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PART |
Dave Hannah
|
|
|
miles Phone #: ###-#### shaft wall repair
|
BLD-Ceiling Grid Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Framing/Rough-in | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2019 | 11/12/2019 | 11/13/2019 | P | PASS |
Dave Hannah
|
|
|
Miles Phone #: ###-####
|