BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Jim Storey
|
|
|
SCREENED // Vince Phone #: ###-####
|
DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/8/2020 | 7/8/2020 | 7/8/2020 | A | DONE |
Jim Storey
|
|
|
SCREENED // Vince Phone #: ###-#### 4.45
|
BLD-Energy code compliance | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PART |
Tell Riley
|
|
|
Vince Phone #: ###-####//energy ok per plan mod//still need to have apporved post attachments at front porch posts//windows in upstairs bath may need to be tempered, cant measure are gyp is blocking glass//
|
BLD-Framing/Rough-in | 4/24/2020 | 4/24/2020 | 4/24/2020 | P | PART |
Tell Riley
|
|
|
Vince Phone #: ###-####//framing corrections made//still need approved post attachment, approved by engineer or architect//document provided but is not stamped//
|
BLD-Energy code compliance | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | FAIL |
Tell Riley
|
|
|
Vince Phone #: ###-####//F02 trusses still need bracing//girders still need nailed//verify R49 insulation values have been acheived--batts show R38//porch post attachment must be approved attachment and be protected from ground/concrete contact by approved methods//
|
BLD-Framing/Rough-in | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PART |
Tell Riley
|
|
|
vince - Screened for COVID 19 symptoms Phone #: ###-####///se plans and truss docs for corrections ok to insulate//
|
BLD-Framing/Rough-in | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | FAIL |
Tell Riley
|
|
|
Vence ** cleared** Phone #: ###-####//CN issued//previous wall bracing corrections have not been addressed//plans are missing 1/2 pages ripped some areas missing//need to provide engineering documents//previous corrections were marked in red on floors//complete inspection was not completed due to missing engineering/plans//
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PART |
Tell Riley
|
|
|
add straps above windows///need to install interior hold downs//provide engineers approval of lsl studs//provide fix for wrong hold downs used at courtyard//ok to wrap and install windows when exterior straps are nailed completely//CN left onsite with framer//exterior shear nailing ok//
|
BLD-Wall Bracing | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | CANC |
Tell Riley
|
|
|
Vince Phone #: ###-####
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | FAIL |
Tell Riley
|
|
|
Vince Phone #: ###-####//still need to install straping//portal frame still needed//CN still stands until all corrections made//site contact was informed to complete all corrections and call for re-inspection when complete//
|
BLD-Wall Bracing | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | FAIL |
Mike Jordan
|
|
|
Vince Phone #: ###-####. Provide 8d hot dipped galvanized nails into sill plate. Nail off all straps. Missing stdh 14 on interior wall. Missed portal frame on interior/exterior wall. needs to install all CMST16 straping and blocking over openeings as noted on wall bracing plans.
|
BLD-Footing | 12/18/2019 | 12/19/2019 | 12/19/2019 | P | PART |
Tell Riley
|
|
|
Pat Phone #: ###-####//setbacks per plans//rebar in garage openings//will cover after pour//no frost observed in subgrade at time of inspection//
|