Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-03657
StatusFinaled
Name ARMADA HOMES
Site Address 9678 W MACAW ST
Project NameEronel 15-1
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 1884 sq. ft., two story (first story 1201 sq. ft., second story 683 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 132 sq. ft. of covered patio/porch and a 445 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/12/20203/13/20203/13/2020APASS
DetailsTell Riley
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//need to update insulation values on permit, kelly will take care of//ok otherwise//
DOC - Permit Finaled3/13/20203/13/20203/13/2020PPASS
DetailsTell Riley
BLD-Final3/10/20203/11/20203/11/2020ANR
DetailsTell Riley
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//plans show r49 attic insulation, tag shows r 38 installed//
BLD-Blower Door Test Results3/11/20203/11/20203/11/2020ADONE
DetailsTell Riley
2.92 ACH 50
BLD-Other1/7/20201/8/20201/8/2020APASS
DetailsTell Riley
Soffit fire barrier Phone #: ###-#### Inspection requested via web by Kelly Stover//ok per plans//
BLD-Wall Bracing1/2/20201/2/20201/2/2020PPASS
DetailsTell Riley
corrections made//
BLD-Framing/Rough-in1/1/20201/2/20201/2/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//
BLD-Energy code compliance1/1/20201/2/20201/2/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Framing/Rough-in12/27/201912/27/201912/27/2019PPART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok to insulate,, check bathroom doorway header, hangers at landing//CN posted//
BLD-Wall Bracing11/25/201911/27/201911/27/2019AFAIL
DetailsTell Riley
Mark Phone #: ###-####/need to add blocking on first story at all panel edges at shear locations(some vertical blocking will be needed)//Let GC know about eaves that will need to be 24 inches from PL//re-inspection required//
BLD-Foundation10/25/201910/28/201910/28/2019PPART
DetailsTell Riley
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//blankets are the way//confirmed with Mark//
BLD-Footing10/24/201910/25/201910/25/2019PPASS
DetailsTell Riley
about 2 it will be ready // mark Phone #: ###-####//per plans//