BLD-Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Tell Riley
|
|
|
garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover
|
DOC - Permit Finaled | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | CANC |
Tell Riley
|
|
|
|
BLD-Final | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | NR |
Tell Riley
|
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover//plans show R 49 attic insulation, tag show R38 installed//
|
BLD-Blower Door Test Results | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Tell Riley
|
|
|
2.91 ACH 50
|
BLD-Other | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Tell Riley
|
|
|
Soffits//ok per plans//
|
BLD-Framing/Rough-in | 1/1/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//
|
BLD-Energy code compliance | 1/1/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok to insulate//check hangers at landing, and truss bracing//
|
BLD-Framing/Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//correction notice posted//
|
BLD-Wall Bracing | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Tell Riley
|
|
|
Mark Phone #: ###-####
|
BLD-Foundation | 10/25/2019 | 10/28/2019 | 10/28/2019 | P | PART |
Tell Riley
|
|
|
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//forman says blanket crew is on their way to cover//confirmed with Mark//
|
BLD-Footing | 10/24/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
about 2 it will be ready // mark Phone #: ###-####//per plans//
|