BLD-Final | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tell Riley
|
|
|
Lucas Phone #: ###-####//step added//smoke and CO detectors installed//final complete//
|
DOC - Permit Finaled | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | FAIL |
Tell Riley
|
|
|
Lucas - please call 30 min prior Phone #: ###-####//need to add step on side door//need to add smoke and combo detectors//CN posted//
|
BLD-Energy code compliance | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Tell Riley
|
|
|
Lucas Phone #: ###-####
|
BLD-Energy code compliance | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | FAIL |
Tell Riley
|
|
|
Lucas Garcia Phone #: ###-####//wall with new door due to damage is not insulated//
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Tell Riley
|
|
|
Lucas Phone #: ###-####//need airseal-will check at energy inspection discussed with contractor//
|
BLD-Wall Bracing | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
nailing ok//will frame in above window //
|
BLD-Framing/Rough-in | 10/23/2019 | 10/25/2019 | 10/25/2019 | A | NR |
Tell Riley
|
|
|
LUCAS Phone #: ###-####//left message with contact//will need electrical rough in and mechanical rough in passed per description of project//re inspection for framing will need to be scheduled//
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Tell Riley
|
|
|
Lucas Phone #: ###-####//added pier supports and beam per engineering//floor joists fixed as per engineering//
|