BLD-Blower Door Test Results | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | DONE |
Tell Riley
|
|
|
2.96 ACH 50
|
BLD-Final | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Tell Riley
|
|
|
Screened-Christina Phone #: ###-####
|
DOC - Permit Finaled | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Tell Riley
|
|
|
Chrisitna Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Wall Bracing | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####//shear nailing ok//check interior hold down connections at framing//
|
BLD-Wall Bracing | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | PASS |
Tell Riley
|
|
|
concrete at 11 pm // Brian Phone #: ###-####//setbacks per plan//wall ok to pour//blankets onsite// frost protection required//
|
BLD-Footing | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//WIP//blankets onsite//setbacks measured per plans//
|