BLD-Final | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Dave Hannah
|
|
|
Screened- if possible call 30 mins- Shaun Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 4/14/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is compolete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection is complete, signature card not presented at time of inspection.
Screened-Shaun Phone #: ###-#### if possible call 30 mins prior
|
BLD-Ceiling Grid Inspection | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | PEND |
Tell Riley
|
|
|
Call 30 mins ahead- Shawn **cleared** Phone #: ###-####//grid looks ok in offices, need to have mechanical passed prior to cover//marked pending for mechaical inspection//
|
FIRE-Final Inspection | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | FAIL |
Jim Page
|
|
|
Install ceiling tiles in ares where sprinkler protection is complete, ceiling tiles were not installed in new conference room. Project has 2 attached FIR permits for fire sprinkler that will need to be finaled before life fire safety inspection can be signed off.
Call for access 30 mins- Shawn **stated they dont know anyone that is sick or has traveled** Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Brandon Shaw
|
|
|
call ahead 30 minutes // Sean Phone #: ###-####
|