Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04651
StatusFinaled
Name RIVER BROOK CUSTOM HOMES INC
Site Address 5539 W SPAULDING ST
Project Name5539 W. Spaulding
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2160 sq. ft., two story (first story 1082 sq. ft., second story 1078 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 47 sq. ft. of covered patio/porch and a 632 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
*Screened* Damon, call for access code Phone #: ###-####
DOC - Permit Finaled7/24/20207/24/20207/24/2020PPASS
DetailsDave Hannah
BLD-Blower Door Test Results7/23/20207/23/20207/23/2020PNR
DetailsTell Riley
BLD-Final7/22/20207/23/20207/23/2020PNR
DetailsTell Riley
Damin *screened* Phone #: ###-####
BLD-Conference7/15/20207/15/20207/15/2020PDONE
DetailsTell Riley
call if needed- damon *screened* Phone #: ###-####//questions on steps//step at garage/dwelling separation door need to be even height risers--currently 6,6 and 4//landing at front egress door needs to be min 36" in direction of travel//
BLD-Conference6/26/20206/26/20206/26/2020PDONE
DetailsTell Riley
Screened // Mark Phone #: ###-####
BLD-Framing/Rough-in6/19/20206/19/20206/19/2020PFAIL
DetailsTell Riley
Amy Phone #: ###-####//engineering provided for roof accent on front of home//framing does not meet the requirements of the engineering for size, material, and bearing//
BLD-Energy code compliance4/20/20204/23/20204/23/2020ACANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//inspection was already completed//appears fees are still due//
BLD-Energy code compliance4/21/20204/22/20204/21/2020APASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//updated Rescheck was provided for energy trade offs//the insulation and windows are now compliant with the rescheck trade off values//report provided by designer//
BLD-Energy code compliance4/20/20204/20/20204/21/2020PFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan//insulation values do not meet the rescheck documents used to trade off window values that do not meet code minimum//re-inspection will require a re-inspection fee//
BLD-Energy code compliance4/17/20204/20/20204/20/2020AFAIL
DetailsTell Riley
Damon Phone #: ###-####//CN still posted//windows U values do not meet prescriptive requirements, ceiling R values do not meet prescriptive requirements//
BLD-Energy code compliance4/17/20204/17/20204/17/2020PFAIL
DetailsTell Riley
need to use R49 batts in attic, R38 used//window u values do not meet code minimum//possible use res check to trade off //
BLD-Framing/Rough-in4/16/20204/17/20204/17/2020PPART
DetailsTell Riley
Screened- DAMION Phone #: ###-####//joist repair ok, discussed with BCI engineer on phone//swooped roof still pending approval//
BLD-Framing/Rough-in4/15/20204/16/20204/16/2020APART
DetailsTell Riley
framer there now should be done today by 3 pm. Phone #: ###-#### Inspection requested via web by Damion Jordan//repair for notched joist needs to match fix and use correct hangers//framing at swoop near front porch still does not reflect the details on plans-need to use 2x material for rim and ledger-1/2" osb was used// ok to insulate only//
BLD-Framing/Rough-in4/9/20204/10/20204/10/2020PFAIL
DetailsTell Riley
Daiman *cleared* Phone #: ###-####//see plans and bmc calcs for corretions//
BLD-Wall Bracing4/7/20204/7/20204/7/2020PPART
DetailsTell Riley
screened - cough is a side affect of blood pressure medication // Damion Phone #: ###-####//ok, still will need to shear inside of walls near bonus room//
BLD-Wall Bracing4/2/20204/2/20204/2/2020PCANC
DetailsBrandon Shaw
Inspection terminated due to contractor not adhering to the 6' social distancing guideline set by the CDC...
BLD-Framing/Rough-in4/1/20204/2/20204/2/2020PCANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Damion Jordan
BLD-Wall Bracing3/6/20203/6/20203/6/2020APART
DetailsTell Riley
need to add galvanized nails to PT//need to shear 2nd story walls plate to plate discussed onsite//some walls may need to be sheathed on the inside/
BLD-Framing/Rough-in3/4/20203/6/20203/6/2020ACANC
DetailsTell Riley
Shear // Damion Phone #: ###-####
BLD-Foundation1/23/20201/24/20201/24/2020APART
DetailsTell Riley
Damion Phone #: ###-####//WIP//
BLD-Footing1/21/20201/23/20201/23/2020APASS
DetailsTell Riley
late am // Damon Phone #: ###-####//setbacks tight on sides--will recheck at wall inspection//rebar installed per plans//