BLD-Final | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
Dave Hannah
|
|
|
*Screened* Damon, call for access code Phone #: ###-####
|
DOC - Permit Finaled | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | NR |
Tell Riley
|
|
|
|
BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | P | NR |
Tell Riley
|
|
|
Damin *screened* Phone #: ###-####
|
BLD-Conference | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | DONE |
Tell Riley
|
|
|
call if needed- damon *screened* Phone #: ###-####//questions on steps//step at garage/dwelling separation door need to be even height risers--currently 6,6 and 4//landing at front egress door needs to be min 36" in direction of travel//
|
BLD-Conference | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | DONE |
Tell Riley
|
|
|
Screened // Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | FAIL |
Tell Riley
|
|
|
Amy Phone #: ###-####//engineering provided for roof accent on front of home//framing does not meet the requirements of the engineering for size, material, and bearing//
|
BLD-Energy code compliance | 4/20/2020 | 4/23/2020 | 4/23/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan//inspection was already completed//appears fees are still due//
|
BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/21/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan//updated Rescheck was provided for energy trade offs//the insulation and windows are now compliant with the rescheck trade off values//report provided by designer//
|
BLD-Energy code compliance | 4/20/2020 | 4/20/2020 | 4/21/2020 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan//insulation values do not meet the rescheck documents used to trade off window values that do not meet code minimum//re-inspection will require a re-inspection fee//
|
BLD-Energy code compliance | 4/17/2020 | 4/20/2020 | 4/20/2020 | A | FAIL |
Tell Riley
|
|
|
Damon Phone #: ###-####//CN still posted//windows U values do not meet prescriptive requirements, ceiling R values do not meet prescriptive requirements//
|
BLD-Energy code compliance | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | FAIL |
Tell Riley
|
|
|
need to use R49 batts in attic, R38 used//window u values do not meet code minimum//possible use res check to trade off //
|
BLD-Framing/Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | P | PART |
Tell Riley
|
|
|
Screened- DAMION Phone #: ###-####//joist repair ok, discussed with BCI engineer on phone//swooped roof still pending approval//
|
BLD-Framing/Rough-in | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PART |
Tell Riley
|
|
|
framer there now should be done today by 3 pm. Phone #: ###-#### Inspection requested via web by Damion Jordan//repair for notched joist needs to match fix and use correct hangers//framing at swoop near front porch still does not reflect the details on plans-need to use 2x material for rim and ledger-1/2" osb was used// ok to insulate only//
|
BLD-Framing/Rough-in | 4/9/2020 | 4/10/2020 | 4/10/2020 | P | FAIL |
Tell Riley
|
|
|
Daiman *cleared* Phone #: ###-####//see plans and bmc calcs for corretions//
|
BLD-Wall Bracing | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PART |
Tell Riley
|
|
|
screened - cough is a side affect of blood pressure medication // Damion Phone #: ###-####//ok, still will need to shear inside of walls near bonus room//
|
BLD-Wall Bracing | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | CANC |
Brandon Shaw
|
|
|
Inspection terminated due to contractor not adhering to the 6' social distancing guideline set by the CDC...
|
BLD-Framing/Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Damion Jordan
|
BLD-Wall Bracing | 3/6/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Tell Riley
|
|
|
need to add galvanized nails to PT//need to shear 2nd story walls plate to plate discussed onsite//some walls may need to be sheathed on the inside/
|
BLD-Framing/Rough-in | 3/4/2020 | 3/6/2020 | 3/6/2020 | A | CANC |
Tell Riley
|
|
|
Shear // Damion Phone #: ###-####
|
BLD-Foundation | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PART |
Tell Riley
|
|
|
Damion Phone #: ###-####//WIP//
|
BLD-Footing | 1/21/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Tell Riley
|
|
|
late am // Damon Phone #: ###-####//setbacks tight on sides--will recheck at wall inspection//rebar installed per plans//
|