Permit NumberBLD19-04725
StatusIssued
Name DAVIS ELWAY LLC
Site Address 4595 W HILLCREST VIEW DR
Project NameWeber Residence Addition
Customer Number 
ePlanReviewNo
Description
SPECIAL INSPECTIONS REQUIRED - MODIFICATION, FLOOR SYSTEN SWITCHED TO TRUSSES PER ATTACHED ENGINEERING 2/4/20 **jab** Permit for a 640sq' addition of two bedrooms and a walk-in closet above an existing garage. Bearing structure is steel. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance5/5/20205/6/20205/6/2020APASS
DetailsTell Riley
Brian *screened* Phone #: ###-####//ok per plans, add insulation at cavity above windows//steps--got 2nd opinion from supervisor, ok to leave, not many other options//
BLD-Framing/Rough-in5/4/20205/4/20205/4/2020PPASS
DetailsTell Riley
Bryan - will call Tell to determine if virtual inspection is appropriate Phone #: ###-####//ok to insulate, need to figure out steps at cut in doorway//
BLD-Wall Bracing4/20/20204/21/20204/21/2020APASS
DetailsTell Riley
Brian Phone #: ###-####//shear corrections made, engineers letter provided for corrections//
BLD-Framing/Rough-in4/9/20204/9/20204/9/2020PNR
DetailsTell Riley
Brian *left voicemail for addition framing** Phone #: ###-####//need approval from engineer for strapping in wrong locations//
BLD-Wall Bracing2/11/20202/12/20202/12/2020APART
DetailsTell Riley
Brian Phone #: ###-####//interior shear wall only//will need to see verification that hold downs were installed//
BLD-Foundation1/3/20201/6/20201/6/2020APART
DetailsTell Riley
Brian Phone #: ###-####//outside of garage piers//rebar ok, added ties and j-verts-ok per conversation with design engineer//specials were done for epoxy rebar//pend specials required for concrete on #310 form//
BLD-Conference12/30/201912/31/201912/31/2019ADONE
DetailsTell Riley
Brian Phone #: ###-####
BLD-Foundation12/20/201912/23/201912/23/2019APEND
DetailsTell Riley
Brian Phone #: ###-####//bolts and rebar will need to be approved by engineer, no j hooks on verts, ties difer from plan, and bolts have no bend or washer nut, most bar is welded an not tied// specials for concrete and formwork//pend engineers approval and specials//
BLD-Conference12/13/201912/13/201912/13/2019PDONE
DetailsTell Riley
Brian Phone #: ###-####//phone conversation about smoke detector locations and installation for exisitng dwelling//