BLD-Framing/Rough-in | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Tell Riley
|
|
|
David Baldwin on site contact Phone #: ###-#### Inspection requested via web by Ron Ramza//door framing per plans//
|
BLD-Framing/Rough-in | 7/10/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Tell Riley
|
|
|
Don onsite contact ###-#### or David ###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza//framing appears to be ok per plans//added header for support//wleding special inspection provided//all electrical will surface mount//ok for wall cover only//
|
BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | P | CANC |
Tell Riley
|
|
|
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza//i believe this is the wrong permit, as a framing was canceled yesterday//final should have been for the main building, that permit is under review for a plan mod//let contact know the plan mod needs completed//
|
FIRE-Final Inspection | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | FAIL |
Troy Cobbley
|
|
|
Wrong inspection called in.
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####. If earlier, please call Don. He is driving in from Garden Valley.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza
|
BLD-Framing/Rough-in | 7/2/2020 | 7/7/2020 | 7/7/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Ramza
|
BLD-Foundation | 5/21/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Mike Jordan
|
|
|
Onsite Contact David 208--###-#### Phone #: ###-#### Inspection requested via web by Ron Ramza. Stemwall ok. Also reviewed special inspection report for welding.
|
BLD-Footing | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Mike Jordan
|
|
|
David on-site Contact 830.0212. Phone #: ###-#### Inspection requested via web by Ron Ramza. All issues with new engineering have been resolved. Reviewed special inspection report for epoxy dowelling as well. Ok to place concrete in footing.
|
BLD-Footing | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PEND |
Tell Riley
|
|
|
screened // David Phone #: ###-####//need ro resubmit new engineering for change in design and specify which footings/columns have changed//approved plans/engineering show new columns, piers and footings//new engineering shows built up footings around west end footings//please specify actual location of new design and where existing footings/columns are to remain//pending city approval//
|
BLD-Footing | 4/15/2020 | 4/21/2020 | 4/21/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Ramza//need approved plans and engineering onsite//
|