BLD-Final | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 5/14/2020 | 5/14/2020 | 5/14/2020 | A | DONE |
Mike Jordan
|
|
|
4.2
|
BLD-Final | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs electrical final.
|
BLD-Energy code compliance | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Mike Jordan
|
|
|
This is the house that we have had some Sheetrock hung at Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Mike Jordan
|
|
|
This is the house that we have had some Sheetrock hung at Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Energy code compliance | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|
BLD-Energy code compliance | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | NR |
Mike Jordan
|
|
|
Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 3/26/2020 | 3/26/2020 | 3/26/2020 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Roll block floor joist at all interior bearing locations. Draft stop floor joist to divide area to less than 1,00s.f. Ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 3/17/2020 | 3/23/2020 | 3/23/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. rough in inspection.
|
BLD-Wall Bracing | 3/9/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 2/20/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 2/19/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: 28-###-####
|