BLD-Framing/Rough-in | 8/3/2020 | 8/3/2020 | 8/3/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//Trimmers added under blocking used for truss hanger attachment, creating headers at 14" wide, load paths are now supported//energy ok//
|
BLD-Energy code compliance | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | PEND |
Brandon Shaw
|
|
|
Need to provide Engineering aprroval for truss supported from blocking in garage, see correction notice...
|
BLD-Framing/Rough-in | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//CN posted for framing corrections//2nd floor shear appears to be ok, nailing is covered//ok to insulate only--framing corrections will need to be completed//
|
BLD-Wall Bracing | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PART |
Brandon Shaw
|
|
|
1st floor only...
|
BLD-Foundation | 5/13/2020 | 5/19/2020 | 5/19/2020 | P | PART |
Tell Riley
|
|
|
Mark pour time at 1:30 Phone #: ###-####//WIP//
|
BLD-Footing | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | PART |
Tell Riley
|
|
|
Screened-pour time is at 2pm-Mark Phone #: ###-####//talked with Sue at zoning, verified minumum setback is 20 feet from front pin to garage//setbacks per plans, and minimum per zoning in front//need to delete rebar note from plans as general does not want it installed//
|