BLD-Final | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Tell Riley
|
|
|
Gary *screened* *other door enterance. Phone #: ###-####//two detectors were switched for smoke/co combos to meet code requirements, sent via photos for confirmation//
|
DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | CANC |
Tell Riley
|
|
|
Gary *screened* *other door enterance. Phone #: ###-####
|
BLD-Energy code compliance | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Tell Riley
|
|
|
gary Phone #: ###-####//ok to insulate only//ok to cover interior walls when air seal has been completed//
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | NR |
Tell Riley
|
|
|
*screened* *Virtual inspection requested* Addition at rear with seperate entrance, please call ahead - Gary Phone #: ###-####//no shear inspection scheduled, and already covered//not ready for framinng, need trades inspections first//
|
BLD-Foundation | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PART |
Tell Riley
|
|
|
*screened* Brian Phone #: ###-####
|
BLD-Footing | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PART |
Tell Riley
|
|
|
Call before coming-Brian **cleared** Phone #: ###-####//ok when rebar is not touching earth, pad footing needs to bump out to 5 feet//setbacks appear to meet aproved plans//
|