BLD-Energy code compliance | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PART |
Tell Riley
|
|
|
ok with video/photo // Chris Phone #: ###-####//let Lucas know onsite areas that need fixed--he will fix take photos and hang lid to blow in the attic//2nd floor knee wall VB needs to be on warm side of the wall--let Chris know--will need to verify//other walls that were opened/furred out have had the cavity filled//
|
BLD-Framing/Rough-in | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PART |
Tell Riley
|
|
|
screened // Chris Phone #: ###-####//work accordig to engineering was completed//engineers letter addressed sistered joists at main floor--they are ok, other areas are existing conditions//trades sign offs ok//corrections made, many areas are existing conditions, code compliance was acheived where possible or areas that are exposed//ok to insulate//
|
BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | NR |
Tell Riley
|
|
|
Chris - */non occupied residence SCREENED*/ Phone #: ###-####//new engineering provided for part of the corrections--still need engineering for underfloor//patio is still under review//some areas of concern are existing wall heights and same use//Chris will provide clarification from engineer on part of the new engineering//
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | NR |
Tell Riley
|
|
|
screened // chris Phone #: ###-####//used as conference to discuss structural issues//
|
BLD-Framing/Rough-in | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | FAIL |
Tell Riley
|
|
|
Chris *screened* Phone #: ###-####//left correction notice and called Chris//need more detailed plans for structural//noted on correction, may need structural evaluation from engineer//
|