Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD20-01397
StatusFinaled
Name LEVCO BUILDERS LLC
Site Address 3404 W KIPLING RD
Project NameSimmons Workshop
Customer Number 
ePlanReviewYes
Description
Permit for a remodel to include the demmo of an existing shop and the rebuild of a new 487 sq. ft. shop in it's place. New roof structure to not encroach into 3' setback. No plumbing or mechanical to be installed.- All work per plans, notes, Architectual Stamped dwgs, & local code. Separate electrical permit required. **RDP**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/5/20208/5/20208/5/2020PPASS
DetailsTell Riley
Call 15 minutes.... ok with video/photo // Gabe Phone #: ###-####
DOC - Permit Finaled8/5/20208/5/20208/5/2020PPASS
DetailsTell Riley
BLD-Framing/Rough-in8/3/20208/3/20208/3/2020PPASS
DetailsTell Riley
call 15 mins-Gabe- *screened* Phone #: ###-####//truss corrections have been completed//
BLD-Framing/Rough-in7/28/20207/28/20207/28/2020PFAIL
DetailsTell Riley
Gabe *screened* Phone #: ###-####//engineering provided for fix of trusses modified for pitch change--the engineering fix has not been completed onsite, the fix needs to reflect the approved engineering fix//let Gabe know//
BLD-Framing/Rough-in7/21/20207/22/20207/22/2020APART
DetailsTell Riley
call 15 minutes before.. SCREENED // dave Phone #: ###-####//most corrections made//still need engineers approval on trusses that the top chord was cut and replaced//see correction notice onsite//
BLD-Framing/Rough-in7/14/20207/15/20207/15/2020AFAIL
DetailsTell Riley
Gabe, *screened* Shop not connected to home Phone #: ###-####//Correction notice issued for framing corrections//truss issues need to be addressed and new engineering provided to reflect the installation and modification that was completed onsite//
BLD-Wall Bracing6/29/20206/29/20206/29/2020PPASS
DetailsTell Riley
Jack Phone #: ###-####//ok when HD galvanized nails added at pt plate//
BLD-Framing/Rough-in6/25/20206/26/20206/26/2020PCANC
DetailsTony Young
Joe Phone #: ###-####// needs trades
BLD-Framing/Rough-in6/23/20206/24/20206/24/2020PCANC
DetailsTell Riley
Jack Phone #: ###-####
BLD-Foundation6/4/20206/5/20206/5/2020APART
DetailsTell Riley
stem- Dustin *screened* Phone #: ###-####//WIP-still installing rebar in wall//setbacks still appear to be ok based on front pin being in line with existing fence//
BLD-Footing6/1/20206/2/20206/2/2020APART
DetailsTell Riley
screened // Dustin Phone #: ###-####//pin found in front//appears to be right in line with existing fence//setbacks measure roughly 5' 2" from this line//rear setbacks over 20 feet--15' plus from center of canal//re-verify at wall inspection//
BLD-Footing5/28/20205/29/20205/29/2020ACANC
DetailsTell Riley
Screened- Dustin Phone #: ###-####
BLD-Footing5/28/20205/28/20205/28/2020PNR
DetailsTell Riley
Dustin Phone #: ###-####//not ready//need approved plans onsite//contractor states property pin is in front--will check on re-inspect//need verification of setbacks from canal in back--waiting for call from zoning//