Permanent Service | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
James Ady
|
|
|
Screened- Jamon Phone #: ###-#### All documentation received. Breaker testing complete, afci rating ok. p/s u/g n ok
|
Electrical Rough-In | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | PART |
James Ady
|
|
|
screened - service gear and transformers // Jamie Phone #: ###-#### Serfvice gear and transformers checked. Transformersok to cover, Waiting on Performance testing and AFCI rating.
|
Electrical Rough-In | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
James Ady
|
|
|
Control room wall rough-in Jamie Phone #: ###-#### Continued duct band and Control room walls only ok to cover
|
Conference | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
James Ady
|
|
|
8:30 Am Consult Main hospital Phone #: ###-#### Inspection requested via web by Mark M Discussed requirments of 110.26E(1) Dedicated electrical equipment space. Water lines above equipment must be above structural ceiling to be alowed. Will build a structural soffit around lines to comply with code.
|
Electrical Rough-In | 5/22/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
James Ady
|
|
|
CUP Small offices Sub basement Phone #: ###-#### Inspection requested via web by Mark M walls only ok to cover
|
Electrical Rough-In | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
James Ady
|
|
|
Screened- duct bank inspection-Jamie Phone #: ###-#### Short section in Basement hall ok to cover
|
Electrical Rough-In | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
James Ady
|
|
|
duct bank - screened // Jamey Phone #: ###-#### underground for generator feeds and control wire ok to cover
|
Electrical Rough-In | 4/21/2020 | 4/22/2020 | 4/22/2020 | P | CANC |
James Ady
|
|
|
Screened- Duct Bank inspection-Jamie- Phone #: ###-####
|
Electrical Rough-In | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | PASS |
James Ady
|
|
|
Jamie *cleared* Phone #: ###-#### Underground between Shipping and CUP along side tunnel ok to cover. UFER ok to cover
|
Electrical Rough-In | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | PASS |
James Ady
|
|
|
St. Luke''s - caller uncertain about cleared status - will call and willing to video // Jamie Phone #: ###-#### Remaining area on level G
|
Electrical Rough-In | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Rock A. Hudson
|
|
|
Other electrodes such as underground water pipe and building steel will make up a grounding electrode system. Notes due to large amount of debris in area 3/0 bare copper conductor is positioned. Conrete encased electrode rough in ok cover.
|
Rough-In Permanent Service | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | CANC |
Rock A. Hudson
|
|
|
This is actually a Ufer ground inspection Phone #: ###-#### Inspection requested via web by Scott Campbell Called contact and informed this building permit is suspended job site list posted 4-2-2020. Asked to photo installation and recall when ready.
|
Electrical Rough-In | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | CANC |
Rock A. Hudson
|
|
|
Rough-In Walls for G level Phone #: ###-#### Inspection requested via web by Scott Campbell Called contact and informed this building permit is on the suspended job lite list posted 4-2-2020. Asked them to take several photos and recall for Monday when the normal inspector is scheduled to be back at work.
|
Electrical Rough-In | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
James Ady
|
|
|
Wall inspection for level G. Contact is Tony Holt. Phone #: ###-#### Inspection requested via web by Scott Campbell Level G walls only areas marked on contractor power print
|
Electrical Rough-In | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
James Ady
|
|
|
underground inspection for transformer vault Phone #: ###-#### Inspection requested via web by Scott Campbell transformer vault floor only ok to cover
|
Electrical Rough-In | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
James Ady
|
|
|
Underground inspection, 1st and Jefferson tunnel. Contact is Tony Holt. Phone #: ###-#### Inspection requested via web by Scott Campbell Section 2 headed west towards N2 plant ok to cover
|
Electrical Rough-In | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
James Ady
|
|
|
Underground cover inspection - contact is Tony Holt Phone #: ###-#### Inspection requested via web by Scott Campbell Underground conduit in floor of SE tunnel to main hospital ok to cover
|
Electrical Rough-In | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
James Ady
|
|
|
Contact is Tony Holt. Underground rough-in inspection Phone #: ###-#### Inspection requested via web by Scott Campbell Duct bank on South side of building ok to cover
|
Electrical Rough-In | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
James Ady
|
|
|
Contact is Tony Holt Phone #: ###-#### Inspection requested via web by Scott Campbell Final deck pour ok to cover
|
Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
James Ady
|
|
|
Contact is Tony Holt. Rough in inspection for first floor desk. Phone #: ###-#### Inspection requested via web by Scott Campbell First floor deck pour 1 ok to cover
|
Electrical Rough-In | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
James Ady
|
|
|
Cover inspection - contact is Rene Ramakers Phone #: ###-#### Inspection requested via web by Scott Campbell Sleeves and 3/4in conduits in 1st level concrete ok to cover.
|
Electrical Rough-In | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
James Ady
|
|
|
COVER INSPECTION, CONTACT IS RENE RAMAKERS Phone #: ###-#### Inspection requested via web by Scott Campbell Underground moving E ok to cover
|
Electrical Rough-In | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PASS |
James Ady
|
|
|
Cover inspection, contact is Rene Ramakers Phone #: ###-#### Inspection requested via web by Scott Campbell SE corner Underground only ok to cover
|
Electrical Rough-In | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
James Ady
|
|
|
Contact is Rene Ramakers - wall cover inspection Phone #: ###-#### Inspection requested via web by Scott Campbell South concrete wall LL3 ok to cover
|
Conference | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
James Ady
|
|
|
Conference request at Quality Electric office, 5272 W. Irving St - please call Rene Ramakers to set a time to do so. ###-####. Thanks Phone #: ###-#### Inspection requested via web by Scott Campbell Talked about Service entrance requirments. Must be considered "Outside the building" Can be ran under minimum of 2in concrete. Pull box below main gear ok.
|