Electrical Rough-In | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Rock A. Hudson
|
|
|
2 individuals on site being tested for covid, unable to enter site. Generator pad underground rough in ok cover, verified thru photos.
|
Electrical Rough-In | 8/10/2020 | 8/10/2020 | 8/10/2020 | A | NH |
Rock A. Hudson
|
|
|
Underground RI at generator pad. An employee from this site is being tested for COVID, can send pictures if preferred. Phone #: ###-#### Inspection requested via web by Jeremy Cloud Called contact, no answer, voicemail full unable to leave message. Recall when available.
|
Electrical Rough-In | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
James Ady
|
|
|
Please call Kris Kellner with any questions. Phone #: ###-#### Inspection requested via web by Kevin Perez Underground to floor boxes in existing area only ok to cover. (Serveral conduits were hit during excavation, contractor stated all will be abandond.)
|
Electrical Rough-In | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
James Ady
|
|
|
This is for the ufer ground on the Generator Pad. Please call Corey if you have any questions. Phone #: ###-#### Inspection requested via web by Kevin Perez 1/0 ufer ok to cover
|
Final | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PART |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez 426.28 Ground-fault protection of equipment(Breakers Labeled Heat trace shall have GFPE breakers) 408.8A Feild identification shall be detailed. Partial final only ok
|
Final | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | NR |
James Ady
|
|
|
Please make inspection as late in the day as possible. Phone #: ###-#### Inspection requested via web by Kevin Perez Wanting TCO. not quite ready at time of inspection will reschedule
|
Electrical Rough-In | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Eric Story
|
|
|
Site contact is Corey Hayes ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Suspended ceilings minus electrical room ok to cover U/G ok to cover for lights
|
Electrical Rough-In | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
James Ady
|
|
|
Corey Hayes is the onsite contact 208.760.0980 Phone #: ###-#### Inspection requested via web by Kevin Perez North underground for ATS, South underground from Storage building to Water pump, North open office area Border tiles only. ok to cover
|
Conference | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
James Ady
|
|
|
Please call Kris Kellner Phone #: ###-#### Inspection requested via web by Kevin Perez Discussed Bonding of Generator and Main service gear. (4 wire ATS Nuetral break Bond at Generator, 3 wire ATS No Nuetral break No bond at generator.) Discussed Border tile install. No border tiles before inspection.
|
Permanent Service | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
James Ady
|
|
|
Please contact Jeremy Cloud ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez 14.3K AFCI. 50K Breaker 120/208 Water bond connection made, Sub panel feeders landed only. Branch circuits still needing landed. p/s u/g n ok
|
Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Daryl DeGrange
|
|
|
Corey Hayes is the onsite contact 208.353.2723 Phone #: ###-#### Inspection requested via web by Kevin Perez rough-in ok cover service under ground phase1
|
Electrical Rough-In | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
James Ady
|
|
|
Corey Hayes is the onsite contact for this project, ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Underground in courtyard ok to cover. Breezeway walls only ok to cover
|
Electrical Rough-In | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud 4 exterior soffits only ok to cover
|
Electrical Rough-In | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Entry hard lid only ok to cover
|
Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Back hall, Food prep and conf. room hard lids only ok to cover
|
Electrical Rough-In | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | PASS |
Rock A. Hudson
|
|
|
Site underground Phone #: ###-#### Inspection requested via web by Jeremy Cloud Parking lot under ground rough in ok cover
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Restrooms only ok to cover
|
Electrical Rough-In | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud t.v locations only ok to cover
|
Electrical Rough-In | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Underground on far E end of parking lot ok to cover
|
Electrical Rough-In | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud TV recep area's excluded from inspection. Remaining area ok walls only ok to cover
|
Electrical Rough-In | 3/18/2020 | 3/20/2020 | 3/20/2020 | A | NR |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud not ready re call
|
Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
James Ady
|
|
|
Underground inspection Phone #: ###-#### Inspection requested via web by Jeremy Cloud No answer at contact number only underground visable is from E parking lot light to E edge of job site. OK to cover
|
Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/18/2020 | A | CANC |
James Ady
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jeremy Cloud Inspection cancelled from web by: Jeremy Cloud
|
Electrical Rough-In | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Remaining 2in conduit to Garage and 3/4in to parking lights along back side of parking lot.
|
Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
James Ady
|
|
|
Underground Rough In Phone #: ###-#### Inspection requested via web by Jeremy Cloud West side parking lot Underground to pole bases only ok to cover
|
Electrical Rough-In | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Underground covered prior to inspection. 2- 2in conduits crossing pavered parking area from main building to garage and 1 1in conduit crossing pavered area for parking lot lights. Ends had been left open to verify deapth.
|
Electrical Rough-In | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Eric Story
|
|
|
Inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud 1st phase of U/G ok to cover
|
Electrical Rough-In | 11/26/2019 | 12/2/2019 | 12/2/2019 | A | PASS |
Tom Saunders
|
|
|
Inspect ufer for cover Corey Hayes ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud... ok to cover...2 bare copper for services and 1 for future backup generator
|