Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberELE19-04505
StatusIssued
Name MOUNTAIN POWER ELECT
Site Address 555 E PARKCENTER BLVD
Project Name 
Customer Number19-042
ePlanReviewNo
Description
New: Provide the electrical work associated with the Delta Dental building remodel and addition.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In8/10/20208/10/20208/10/2020PPASS
DetailsRock A. Hudson
2 individuals on site being tested for covid, unable to enter site. Generator pad underground rough in ok cover, verified thru photos.
Electrical Rough-In8/10/20208/10/20208/10/2020ANH
DetailsRock A. Hudson
Underground RI at generator pad. An employee from this site is being tested for COVID, can send pictures if preferred. Phone #: ###-#### Inspection requested via web by Jeremy Cloud Called contact, no answer, voicemail full unable to leave message. Recall when available.
Electrical Rough-In8/4/20208/5/20208/5/2020APASS
DetailsJames Ady
Please call Kris Kellner with any questions. Phone #: ###-#### Inspection requested via web by Kevin Perez Underground to floor boxes in existing area only ok to cover. (Serveral conduits were hit during excavation, contractor stated all will be abandond.)
Electrical Rough-In7/30/20207/31/20207/31/2020APASS
DetailsJames Ady
This is for the ufer ground on the Generator Pad. Please call Corey if you have any questions. Phone #: ###-#### Inspection requested via web by Kevin Perez 1/0 ufer ok to cover
Final6/30/20207/1/20207/1/2020APART
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kevin Perez 426.28 Ground-fault protection of equipment(Breakers Labeled Heat trace shall have GFPE breakers) 408.8A Feild identification shall be detailed. Partial final only ok
Final6/30/20206/30/20206/30/2020PNR
DetailsJames Ady
Please make inspection as late in the day as possible. Phone #: ###-#### Inspection requested via web by Kevin Perez Wanting TCO. not quite ready at time of inspection will reschedule
Electrical Rough-In6/24/20206/24/20206/24/2020PPASS
DetailsEric Story
Site contact is Corey Hayes ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez
Suspended ceilings minus electrical room ok to cover
U/G ok to cover for lights
Electrical Rough-In6/22/20206/22/20206/22/2020PPASS
DetailsJames Ady
Corey Hayes is the onsite contact 208.760.0980 Phone #: ###-#### Inspection requested via web by Kevin Perez North underground for ATS, South underground from Storage building to Water pump, North open office area Border tiles only. ok to cover
Conference6/16/20206/17/20206/17/2020APASS
DetailsJames Ady
Please call Kris Kellner Phone #: ###-#### Inspection requested via web by Kevin Perez Discussed Bonding of Generator and Main service gear. (4 wire ATS Nuetral break Bond at Generator, 3 wire ATS No Nuetral break No bond at generator.) Discussed Border tile install. No border tiles before inspection.
Permanent Service6/11/20206/11/20206/11/2020PPASS
DetailsJames Ady
Please contact Jeremy Cloud ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez 14.3K AFCI. 50K Breaker 120/208 Water bond connection made, Sub panel feeders landed only. Branch circuits still needing landed. p/s u/g n ok
Electrical Rough-In6/9/20206/10/20206/10/2020APASS
DetailsDaryl DeGrange
Corey Hayes is the onsite contact 208.353.2723 Phone #: ###-#### Inspection requested via web by Kevin Perez rough-in ok cover service under ground phase1
Electrical Rough-In6/4/20206/4/20206/4/2020PPASS
DetailsJames Ady
Corey Hayes is the onsite contact for this project, ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Underground in courtyard ok to cover. Breezeway walls only ok to cover
Electrical Rough-In5/19/20205/19/20205/19/2020PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud 4 exterior soffits only ok to cover
Electrical Rough-In5/11/20205/12/20205/12/2020APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Entry hard lid only ok to cover
Electrical Rough-In5/6/20205/7/20205/7/2020APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Back hall, Food prep and conf. room hard lids only ok to cover
Electrical Rough-In4/28/20204/28/20204/28/2020PPASS
DetailsRock A. Hudson
Site underground Phone #: ###-#### Inspection requested via web by Jeremy Cloud Parking lot under ground rough in ok cover
Electrical Rough-In4/22/20204/22/20204/22/2020PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Restrooms only ok to cover
Electrical Rough-In3/30/20203/30/20203/30/2020PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud t.v locations only ok to cover
Electrical Rough-In3/25/20203/26/20203/26/2020APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Underground on far E end of parking lot ok to cover
Electrical Rough-In3/20/20203/20/20203/20/2020PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud TV recep area's excluded from inspection. Remaining area ok walls only ok to cover
Electrical Rough-In3/18/20203/20/20203/20/2020ANR
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud not ready re call
Electrical Rough-In3/18/20203/19/20203/19/2020APASS
DetailsJames Ady
Underground inspection Phone #: ###-#### Inspection requested via web by Jeremy Cloud No answer at contact number only underground visable is from E parking lot light to E edge of job site. OK to cover
Electrical Rough-In3/18/20203/19/20203/18/2020ACANC
DetailsJames Ady
Phone #: ###-#### >> Inspection requested via web by Jeremy Cloud Inspection cancelled from web by: Jeremy Cloud
Electrical Rough-In3/13/20203/13/20203/13/2020PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Remaining 2in conduit to Garage and 3/4in to parking lights along back side of parking lot.
Electrical Rough-In3/12/20203/12/20203/12/2020APASS
DetailsJames Ady
Underground Rough In Phone #: ###-#### Inspection requested via web by Jeremy Cloud West side parking lot Underground to pole bases only ok to cover
Electrical Rough-In3/4/20203/5/20203/5/2020APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Jeremy Cloud Underground covered prior to inspection. 2- 2in conduits crossing pavered parking area from main building to garage and 1 1in conduit crossing pavered area for parking lot lights. Ends had been left open to verify deapth.
Electrical Rough-In12/11/201912/11/201912/11/2019PPASS
DetailsEric Story
Inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud
1st phase of U/G ok to cover
Electrical Rough-In11/26/201912/2/201912/2/2019APASS
DetailsTom Saunders
Inspect ufer for cover Corey Hayes ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud...
ok to cover...2 bare copper for services and 1 for future backup generator