Final | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon Sauna only final ok
|
Final | 3/1/2020 | 3/3/2020 | 3/3/2020 | P | CANC |
James Ady
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon
|
Electrical Rough-In | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
James Ady
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon Sauna rough in ok
|
Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
James Ady
|
|
|
Please call a minimum of 30 minutes in advance so contractor can meet inspector at the property Phone #: ###-#### Inspection requested via web by Kyle Dillon Wiring Sauna. Discussed using exhisting 6-3 pre-wired for hot tub to feed 6 circuit panel. 2 pole 35A for heater, remaining circuits to be used for general Lighting and receps. No Gfci required for receps inside sauna entry. GFCI protection may be required for heater per manufacturer specs. will need to provide ground rod.
|