Permit Information
Permit NumberESC17-01632
StatusIssued
Name TIM D AUSTIN
Site Address 2619 W FAIRVIEW AVE
Project Namest luke's 27th st development
Customer Number 
ePlanReviewNo
Description
CONCRETE AND STEEL PACKAGE (EARLY PERMIT PACKAGE INCLUDING CIVIL, CONCRETE, STEEL ONLY) FOR ST LUKES 27TH STREET DEVELOPMENT INCLUDING A 3 STORY HOSPITAL & 4 STORY MEDICAL OFFICE BUILDING AND ASSOCIATED SITE IMPROVEMENTS OF APROXIMATELY 7 ARCES OF IMPROVEMENT. SHELL/ TENNANT IMPROVEMENT PACKAGE FOR THE HOSPITAL AND MEDICAL OFFCE TO BE SUBMITTED AT LATER DATE, PARKING STRUCTURE TO BE SUBMITTED AT A LATER DATE, LANDSCAPE TO BE SUBMITTED AT A LATER DATE. UTILITY YARD WILL BE SUBMITTED AS PART OF THE SHELL AND TI PACKAGE AT LATER DATE.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Conference7/22/20207/22/20207/22/2020PDONE
DetailsAndy J. Long
New project manager Kieth Larue w/ Point Core Construction

775 ###-####

Plan is to do some maintenance and re-install of BMPs and Keith will call for a follow up inspection.
General Inspection7/13/20207/13/20207/13/2020 DEFR
DetailsMichael Zawacki
Suspect covid site 6-26, no updates
General Inspection6/11/20206/11/20206/15/2020 PASS
DetailsMichael Zawacki
Site is clean, no trackout or issues.
General Inspection5/11/20205/11/20205/14/2020 PASS
DetailsAndy J. Long
No trackout. Clean perimeter. NO corrections requested.
General Inspection4/3/20204/9/20204/15/2020APASS
DetailsAndy J. Long
follow up inspection

Corrections completed as requested. No trackout or discharges observed.

Actions completed:
- All storm drain sediment bags installed around perimeter of site have been maintained/emptied.
- All trash that was seen along Fairview has been picked up.

Site is in compliance.
Tracking Control4/2/20204/3/20204/3/2020APASS
DetailsAndy J. Long
Corrections completed:

- trackout from previous week has been cleaned up. 27th street and Fairview have been
- addional rock added at inside end of construction entrance - exisiting entrance to remain compacted to prevent dragging rocks into roadway.
- most trash has been picked

Corrective actions for next week

- Sweep sidewalk and gutter at 27th street exit each day
- Maintain or replace storm drain sediment bags. Bag on 25th @ Fairview is full.
- Finish picking up trash along Fairview within 1 block west of 25th

Follow up inspection is scheduled
Tracking Control3/31/20203/31/20204/1/2020PFAIL
DetailsAndy J. Long
Corrections requested not completed.
- trackout on 27th
- dirt/sand in gutters
- full DI bag on 25th & Fairview
- construction entrance compacted
- trash along perimeter on Fairiview


Working on NOV or escalated enforcement.
Tracking Control3/24/20203/25/20203/26/2020PFAIL
DetailsAndy J. Long
Some additional rock added to construction entrance. No new trackout from site.

- 27th Street has not been swept, lots of sand/dirt from site in gutter, bike lane, and median. Street needs sweeping as well as the right turn to Fairview
- loose trash still along perimeter fence on Fairview

If no corrective actions, will place re-inspection fees on site for follow up inspections conducted until full compliance with requests
Tracking Control3/23/20203/24/20203/24/2020APEND
DetailsAndy J. Long
SLHS RP/construction manager responded to correction request.

- additional rock has been added to construction entrance.

- 27th Street and trash on Fairview has not been picked up yet as requested.

Follow up scheduled
Complaint Inspection3/20/20203/20/20203/23/2020PFAIL
DetailsAndy J. Long
trackout and debris reported

Trackout on 27th going up towards Fairview and Main Street. Visible trash around perimeter.

Corrective actiions needed:

- sweep street, sidewalk and gutter on 27th street
- repair/refresh compacted construction entrance on 27th and 25th.
- pick up any loose construction trash and discarded wrapping around the perimeter fencing on inside and outside of street.
General Inspection3/9/20203/9/20203/9/2020 PASS
DetailsMichael Zawacki
No trackout to 27th, gate onto 25th is closed. Washout on site, nearly full, is located by mortar mixer. All storage on site, no loose or blowing trash.
No esc issues at site.
General Inspection2/6/20202/6/20202/6/2020 PASS
DetailsAndy J. Long
No trackout. No discharges or muddy water in gutters observed. Vertical construction in progress.
General Inspection1/3/20201/6/20201/9/2020APASS
DetailsAndy J. Long
NO trackout observed. Workers for site parking across the street on pavement. Perimeter free of loose trash and debris. No corrections requested.
General Inspection12/23/201912/23/201912/23/2019 CANC
DetailsMichael Zawacki
General Inspection11/21/201911/21/201911/21/2019 PASS
DetailsMichael Zawacki
Met with PM Ken on site. Gave a reminder about trackout and be ready for winter.
Site is clean, only issue is 1 of the washouts by the masons is overfilled and some has spilled out.
General Inspection10/21/201910/21/201910/21/2019 PASS
DetailsAndy J. Long
No trackout from entance. Permiter is clean. Vertical construction in progress
Tracking Control9/17/20199/18/20199/23/2019APASS
DetailsAndy J. Long
No trackout. No mud on rock entrance. Extra long length.No corrections requested at this time.
General Inspection9/16/20199/16/20199/17/2019 FAIL
DetailsAndy J. Long
Need to refresh/improve construction entrance. Trackout out to Shoreline/27th observed
General Inspection8/15/20198/15/20198/16/2019 PASS
DetailsMichael Zawacki
WIP on steel core. Site has long entrance, no tracking to 27th. No dust, site is contained.
General Inspection7/15/20197/15/20197/16/2019 PASS
DetailsMichael Zawacki
WIP on steel frame. Entrance on site, no blowing dust or trackout.
General Inspection6/10/20196/13/20196/14/2019PPASS
DetailsAndy J. Long
General Inspection6/6/20196/6/20196/10/2019 CANC
DetailsAndy J. Long
General Inspection5/6/20195/6/20195/6/2019 PASS
DetailsMichael Zawacki
Working on steel frame. Very few workers on site. Will need to watch for dust over summer.
General Inspection4/4/20194/4/20194/4/2019 PASS
DetailsMichael Zawacki
No tracking onto 27th. Gate on 25th was closed.
General Inspection3/4/20193/4/20193/4/2019 PASS
DetailsMichael Zawacki
Currently only work is on vertical steel. Lots of standing water on site. Stabalized entrance on each side. No ESC issues.
Tracking Control1/30/20191/31/20191/31/2019APASS
DetailsAndy J. Long
Trackout on sidewalk and right lane northbound to Fairview has been cleaned. Sand and dirt in gutter has been cleaned up.
Tracking Control1/14/20191/15/20191/16/2019APASS
DetailsAndy J. Long
No new trackout, trackout from Monday PM was cleaned Tuesday AM.

Corrective actions taken:

- Additional rock added on top of existing entrance to Shoreline/27th. Length increased.
- sandy road mix added for site haul loop. Trucks enter and exit via the rock entrance and avoid muddy areas and limit travel through site. Access to lined washout pit has also been stabilized with the road mix.

Requested that sidewalk and gutter around the entrance should be broomed and swept at the end of each day or as soon as significant trackout is visible.
Complaint Inspection1/14/20191/15/20191/15/2019APEND
DetailsAndy J. Long
trackout complaint received

Verbal correction request to RP to clean up existing trackout on sidewalk and on Shoreline/27th street north to Main.

- improve construction entrance. Increase length.
- determine where trucks are picking up mud in the site (concrete washout access? employee parking?) Make changes or add stabilized access.
- check storm drain sediment bags for maintenance

Follow up inspection later today. RP said streets will be swept and other corrections completed.
Tracking Control1/9/20191/11/20191/11/2019PPASS
DetailsAndy J. Long
New construction entrance rock and maintenance conducted on the west entrance to 27th. No new trackout, no new corrections requested.
Conference1/9/20191/9/20191/9/2019ADONE
DetailsAndy J. Long
Phone conversation with RP Ken about uncompacting the rock construction entrance and add more rock.

Follow up on Friday PM.
Complaint Inspection1/7/20191/7/20191/8/2019PPASS
DetailsMichael Zawacki
No ESC violations at time of inspection. Met with RP, they clean up streets end of every work day.
General Inspection12/12/201812/12/201812/19/2018PPASS
DetailsMichael Zawacki
No trackout from either entrance. Fill material has been brought in to elevate grad of parking lot and road through site. It is no longer as swampy and muddy in middle, lots of mud down in work area where no one parks.
General Inspection12/4/201812/4/201812/4/2018PPEND
DetailsMichael Zawacki
New entrances need to be made with larger crushed rock. Current rock is 1" minus and compacted and frozen. Site is already showing freeze/thaw in sun and will be muddy. Left message with Ken from St.Lukes, project manager.
General Inspection11/8/201811/8/201811/8/2018 PASS
DetailsMichael Zawacki
Met on site with Kenneth. Concrete washout will be dug and lined with 15mil vapor barrier before concrete work. Construction entrances are scraped every day, Lurre has sweeper when needed.
General Inspection10/5/201810/8/201810/8/2018APART
DetailsAndy J. Long
follow up

No trackout or discharges, permit posted and RP on dust. Some fugitive dust is being kicked up on haul road. Construction entrance is getting packed in.

Correction request:
- apply water to haul road to reduce dust
- roughen up consruction entrance and/or add more rock.
- Need to install rock at any access point where vehicles exit the site.

Verbal
Complaint Inspection10/5/201810/5/201810/5/2018PPEND
DetailsAndy J. Long
dust?

No dust or trackout observed. May have been when dumping the rock for the large seepage bed on site. Will follow up.
Conference9/28/20189/28/20189/28/2018PPASS
DetailsAndy J. Long
RP is Ken Story - 208.320.3575

Site is now active. ESC permit sign posted on job trailer in SW corner of site. Rock construction entrance is properly installed on 27th Street. Surrounding MS4 storm drains have sediment protection installed. Current dry conditions are allowing truck to exit onto Fairview using existing access points without trackout. RP stated he will install rock construction entrance on Fairview and update SWPPP site map with location as use increases or trackout becomes an issue.

Perimeter wattles installed on west side of project. Additional fill dirt is being hauled onto site by Lurre. Water truck is operating to control fugitive dust.

Approved for construction. Notified RP that they will need to post EPA CGP permit & swppp info.


General Inspection9/18/20189/18/20189/18/2018 PASS
DetailsMichael Zawacki
Currently only material storage, no construction activity. 2 stock piles on site, some office trailers stored on southwest corner. Workers for project across street arr parking in lot. Lots of dust when vehicles drive over lot.