Permit Information
Permit NumberFIR14-00071
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 4016 S COUNCIL SPRING RD
Project NameThe Terraces- Bldg L
Customer NumberUDG ONLY
ePlanReviewYes
Description
The fire sprinkler scope of work consists of 6”x49± C-900 underground piping with a yard PIV associated fittings and thrust blocks.

11/25/2014 - Plan Mod #1
Changed underground layout. The hydraulic calculation are satisfactory.

To construct a new 11,850 square foot, one story, wood framed skilled nursing facility and related site improvements. This nursing home will contain 16 sleeping units with individual restrooms, as well as, a kitchen, dining and hearth room social area. This building will also contain a hair salon, laundry, storage and mechanical areas. This building is divided into two smoke compartments by a one-hour smoke barrier wall. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/10/201512/16/201512/16/2015PPASS
DetailsJim Page
Final inspection for underground passed/complete
INSP-Final Inspection12/10/201512/11/201512/10/2015PCANC
DetailsJim Page
Bldg L Final and trip test
Please call Raul 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in/Hydro6/26/20156/26/20156/26/2015PPASS
DetailsThomas Walsh
Bldg L dry pipe system hydrotest (200 psi @ 2 hours) - PASSED
INSP-Sprinkler Rough-in6/25/20156/25/20156/25/2015PCANC
DetailsThomas Walsh
Wrong permit called in for this inspection. See FIR14-00751, dated 6/25 for correct permit and inspection notes.
INSP-Final Inspection5/29/20156/1/20156/1/2015PCANC
DetailsThomas Walsh
Final signoff on FSUG cannot be granted until fire alarm system interface components, including tampers and waterflows, can be completed.
INSP-Sprinkler Rough-in/Hydro5/27/20155/27/20155/27/2015APASS
DetailsThomas Walsh
FSUG Hydrotest - 200 psi @ 2 hours - PASSED
NOTE: Siesmic clearance around U/G stub up in riser room still needed, as noted during flush test,
INSP-Sprinkler Rough-in/Hydro5/26/20155/27/20155/27/2015ACANC
DetailsThomas Walsh
Hydrotest of FSUG supply line from city connection to BOR - 200 psi at 2hours - PASSED
NOTE: Siesmic clerance still needed around stub up through concrete floor slab in riser room - noted at system flush test.
INSP-Supply line flush4/17/20154/17/20154/17/2015PPART
DetailsKatie Marron
Underground flush completed satisfactory. Noted that there needs to be seisimic clearance between ductile riser and floor slab in bldg L.
INSP-Sprinkler Rough-in9/12/20149/15/20149/15/2014PPART
DetailsForrest France
Revise thrust blocking at the 90 upstream of the ductile riser prior to cover.
INSP-Sprinkler Rough-in8/26/20148/26/20148/29/2014PPART
DetailsForrest France
UG fire supply line at building L from the meter to a point just ahead of the first 90 okayed for bury. NOTE: thrust blocking not yet installed.