Permit Information
Permit NumberFIR15-00071
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 815 E PARK BLVD
Project NameSt. Luke's Health System TI
Customer Number 
ePlanReviewYes
Description
[St. Luke's Health System TI]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Remodel for a new office tenant. This building was upgraded under BLD06-01825, it was fire sprinklered for story and area increase. Work to include: demolition of existing non-bearing walls, construction of new interior non-bearing walls to several independent area, installation of new mechanical, new electrical, new lighting, new plumbing, installation of new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/16/20154/17/20154/17/2015APASS
DetailsKatie Marron
Scope of work completed. Final walk through completed, sprinkler pass. Sprinkler permit finaled.
INSP-Final Inspection4/14/20154/14/20154/14/2015PPART
DetailsKatie Marron
Final walk through completed at 2nd floor.
INSP-Sprinkler Rough-in4/14/20154/14/20154/14/2015PPART
DetailsKatie Marron
1st Floor ok to cover at drop ceiling per plan.
INSP-Sprinkler Rough-in3/30/20153/31/20153/30/2015APART
DetailsForrest France
Okayed for cover- inspection completed 3/30
INSP-Sprinkler Rough-in3/27/20153/30/20153/30/2015APART
DetailsForrest France
Overhead sprinkler work at the grid ceilings on the 2nd and 1st floor remodel areas approved for cover.
INSP-Sprinkler Rough-in2/12/20152/13/20152/13/2015APASS
DetailsTroy Cobbley
Rough-in for flex heads appears ok. Will need another rough-in when t-bar has been installed and pendants placed.