Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberFIR19-00390
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 600 W CURLING DR
Project NameThe Bomb Shelter
Customer Number 
ePlanReviewYes
Description
New wet system in an existing 2 story underground bomb shelter.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/26/20202/27/20202/27/2020PPASS
DetailsJim Page
Final fire sprinkler inspection is complete.

We would like to schedule this in conjunction with the fire alarm inspection. Please call Jeff with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in2/27/20202/27/20202/27/2020PPASS
DetailsJim Page
Rough in inspection is complete.

We would like to complete this in conjunction with our other inspection today. Please call Troy with time frame or questions Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in/Hydro1/8/20201/9/20201/9/2020ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Supply line flush1/7/20201/8/20201/8/2020APASS
DetailsJim Page
**PASS Flush of underground and remote FDC piping** MAS** 9:30 with Suez Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro1/7/20201/7/20201/7/2020PDONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed.

UG Hydro. Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in12/17/201912/18/201912/18/2019APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/16/201912/17/201912/17/2019APART
DetailsJim Page
Due to this being a steep hiilside project, undergorund supply approved for partial cover, fittings to be left exposed and will be inspected following day.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/16/201912/16/201912/16/2019PCANC
DetailsJim Page
Rescheduled for 17DEC2019 per conversation with point of contact, this request is cancelled.

UG Phone #: ###-#### Inspection requested via web by Matthew Lewis