INSP-Final Inspection | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Page
|
|
|
Sprinkler head coverage corrections for prop type decoration obstructions has been corrected, approved for cover. As builts must be submitted and permit reissued before final inspection.
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete, approved for cover.
Mike Phone #: ###-####
|