INSP-Final Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection request, needed flush. Tanner Phone #: ###-####
|
INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground flush witnessed.
Tanner *screened* Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping hydro test witnessed.
bld K // Kyle Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Troy Cobbley
|
|
|
*PASS** Ok to cover underground. Thrust blocks in place, rebar tie downs coated.**MAS**
underground // Kyle Phone #: ###-####
|