INSP-Final Inspection | 2/10/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area work complete.
|
INSP-Sprinkler Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above suspended ceiling complete, a couple of areas has plywood supporting grid, plywood nees to be treated wood or replaced with non-combustible material, if wood is not treated and remains then upright heads will be required.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|