INSP-Final Inspection | 3/23/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by John Lopez
|
INSP-Final Inspection | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | CANC |
Troy Cobbley
|
|
|
Canceled per John.. Phone #: ###-#### Inspection requested via web by John Lopez
|
INSP-Alarm Testing | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | DONE |
Troy Cobbley
|
|
|
To final project I need the plan mods, verify changes in the field, shunt in elevator repaired, map and final doc's
Troy Phone #: ###-####
|
INSP-Final Inspection | 3/17/2020 | 3/18/2020 | 3/18/2020 | P | FAIL |
Troy Cobbley
|
|
|
Testing today consisted of a walk through for business. See city approved plans for minor modifications needed for notification devices. Plan resubmittals are needed to show the changes. We also tested the smoke detectors and notification on the 4th floor. Need to test 3rd, 2nd, 1st floors and elevator.
Phone #: ###-#### Inspection requested via web by John Lopez
|
INSP-Alarm Testing | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | DONE |
Troy Cobbley
|
|
|
Lee verified the head end equipment and the interconnection with the fire sprinkler devices. He noted that there may be sync issues. Candellas and smoke detectors need tested as well as elevator recall.
John Phone #: ###-####
|
INSP-Alarm Testing | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | NR |
Troy Cobbley
|
|
|
Plan mods are needed showing the correct fire alarm panel model installed and the correct means of communication installed. These items currently do not match the approved plans. No testing performed.
Phone #: ###-#### Inspection requested via web by John Lopez
|