INSP-Final Inspection | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | FAIL |
Jim Page
|
|
|
Second escutcheon piece missing on 3 heads.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, approved for cover.
was told the insulation was fixed Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Final Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | FAIL |
Jim Page
|
|
|
Plastic sheeting is resting on top of sprinkler head. Insulation is resting on top of sprinkler head. Insulation hanging down around head below deflector. Plastic sheeting along west wall needs to be secured to the deck, plastic sheeting along west wall is hanging down preventing proper coverage for uprights.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in is ok but piping can not be covered until the insulation at the roof deck has been repaired.
Contact: Nick Curtis Site is open for inspection all day. Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|